If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0365042408000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.106216,"lon":-114.433183,"icon":""}]} |
Location: 00/08-24-036-04W5/0 | |
Location Alias: 00/08-24-36-04 W5M | |
Location Alias 2: 00/08-24-036-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 5 | |
Range: 04 | |
Section: 24 | |
County/Municipality: Red Deer County | |
Well Name: HB IMP N LANAWAY 8-24-36-4 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0017869 | |
License Date: 1959-10-01 | |
License Status: RecCertified | |
Spud Date: 1959-11-24 | |
Final Drill Date: 1960-01-21 | |
Well Total Depth: 2972.10 m | |
Surface Hole Latitude: 52.106216 | |
Surface Hole Longitude: -114.433183 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1959-10-01 | Obtained License |
1959-12-04 | Drill Stem Test Performed |
1959-12-09 | Drill Stem Test Performed |
1959-12-24 | Drill Stem Test Performed |
1960-01-07 | Drill Stem Test Performed |
1960-01-14 | Drill Stem Test Performed |
1960-01-18 | Drill Stem Test Performed |
1960-01-21 | Finished Drilling |
1960-01-21 | Well Mode changed to Drilled and Cased |
1960-01-22 | Drill Stem Test Performed |
1960-01-26 | Production Casing Operation Performed |
1960-01-28 | Perforation Treatment Performed - Jet Perforation |
1960-01-29 | Perforation Treatment Performed - Acid Wash - No Pressure |
1960-02-04 | Perforation Treatment Performed - Acid Wash - No Pressure |
1960-02-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1960-02-04 | Perforation Treatment Performed - Jet Perforation |
1960-02-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1960-02-06 | Perforation Treatment Performed - Bullet Perforation |
1960-02-06 | Perforation Treatment Performed - Fractured |
1960-02-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1960-02-10 | Perforation Treatment Performed - Acid Wash - No Pressure |
1960-02-10 | Perforation Treatment Performed - Cement Squeeze |
1960-02-10 | Perforation Treatment Performed - Fractured |
1960-02-10 | Perforation Treatment Performed - Jet Perforation |
1960-07-31 | Well Began Production |
1960-07-31 | Well Fluid changed to Crude Oil |
1960-07-31 | Well Mode changed to Pumping |
1969-05-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1969-05-23 | Well Abandoned |
1969-05-23 | Well Fluid changed to Crude Oil |
1969-05-23 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1960-01-28 | Perforation | 2402.10 | 2403.30 | 13 |
1960-02-10 | Perforation | 1821.80 | 1824.50 | 13 |
1960-02-10 | Acid Wash | 1821.80 | 1824.50 | 0 |
1960-02-10 | Acid Treatment | 1821.80 | 1824.50 | 0 |
1960-02-10 | Fracture | 1821.80 | 1824.50 | 0 |
1969-05-21 | Packing Device Capped w/Cement | 1104.90 | 1104.90 | 0 |
1960-01-29 | Acid Wash | 2402.10 | 2403.30 | 0 |
1960-02-04 | Packing Device Capped w/Cement | 2396.60 | 2396.60 | 13 |
1960-02-04 | Perforation | 2351.80 | 2354.90 | 0 |
1960-02-04 | Acid Wash | 2351.80 | 2354.90 | 13 |
1960-02-06 | Bullet Perforation | 2351.80 | 2354.90 | 0 |
1960-02-06 | Acid Treatment | 2351.80 | 2354.90 | 0 |
1960-02-06 | Fracture | 2351.80 | 2354.90 | 0 |
1960-02-10 | Cement Squeeze | 2351.80 | 2354.90 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 1548 | 0.0 | 0.0 | 0.0 |
For data sources see[5]