X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365031201002

Well Details

Well ID: 0365031201002
Loading map...
Location: 00/01-12-036-03W5/2
Location Alias: 00/01-12-36-03 W5M
Location Alias 2: 00/01-12-036-03 W5/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 03
Section: 12
County/Municipality: Red Deer County
Well Name: CNGL MARKER 1-12-36-3
Operator Name: Harvest Operations Corp.
License Number: 0145309
License Date: 1990-09-06
License Status: Amended
Spud Date: 1999-07-23
Final Drill Date: 1999-08-13
Well Total Depth: 2835.00 m
Surface Hole Latitude: 52.072350
Surface Hole Longitude: -114.298084

For data sources see[1][2]

Well History

Date Event
1990-09-06 Obtained License
1999-07-10 Well Log Performed
1999-07-23 Well Log Performed
1999-07-26 Direction Drilling Operation Performed - Horizontal
1999-08-13 Finished Drilling
1999-08-13 Well Log Performed
1999-08-15 Liner Casing Operation Performed
1999-08-15 Perforation Treatment Performed - Open-Hole Completion
1999-08-15 Perforation Treatment Performed - Slotted Liner or Casing
1999-08-17 Well Log Performed
1999-08-18 Rig Released
1999-08-18 Well Mode changed to Drilled and Cased
1999-08-26 Perforation Treatment Performed - Acid Wash - No Pressure
1999-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-27 Well Began Production
1999-08-27 Well Fluid changed to Gas
1999-08-27 Well Mode changed to Flowing
2016-02-29 Well Fluid changed to Gas
2016-02-29 Well Mode changed to Suspended
2018-06-01 Well Fluid changed to Gas
2018-06-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-07-26 2118.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-08-15 Slotted Liner 2113.70 2707.00 0
1999-08-15 Open Hole/Barefoot Completion 2707.00 2835.00 0
1999-08-26 Acid Wash 2340.00 2600.00 0
1999-08-27 Acid Treatment 2340.00 2600.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 2945 0.0 0.0 0.0
2000 8637 0.0 0.0 0.0
2001 8696 0.0 0.0 0.0
2002 8616 0.0 0.0 0.0
2003 8594 0.0 0.0 0.0
2004 8484 0.0 0.0 0.0
2005 8578 0.0 0.0 0.0
2006 7968 0.0 0.0 0.0
2007 8758 0.0 0.0 0.0
2008 8779 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8663 0.0 0.0 0.0
2011 8758 0.0 0.0 0.0
2012 8782 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8015 0.0 0.0 0.0
2015 1152 0.0 0.0 0.0
2018 4680 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References