X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365031107000

Well Details

Well ID: 0365031107000
Loading map...
Location: 00/07-11-036-03W5/0
Location Alias: 00/07-11-36-03 W5M
Location Alias 2: 00/07-11-036-03 W5/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 03
Section: 11
County/Municipality: Red Deer County
Well Name: CNGL MARKER 7-11-36-3
Operator Name: Harvest Operations Corp.
License Number: 0072366
License Date: 1978-10-12
License Status: Issued
Spud Date: 1978-10-25
Final Drill Date: 1978-11-14
Well Total Depth: 2375.00 m
Surface Hole Latitude: 52.075947
Surface Hole Longitude: -114.318141

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-10-12 Obtained License
1978-11-14 Finished Drilling
1978-11-17 Drill Stem Test Performed
1978-11-18 Production Casing Operation Performed
1978-11-30 Perforation Treatment Performed - Jet Perforation
1978-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-12-04 Perforation Treatment Performed - Fractured
1978-12-18 Well Mode changed to Drilled and Cased
1980-02-02 Perforation Treatment Performed - Jet Perforation
1980-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-01 Perforation Treatment Performed - Cement Squeeze
1980-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-02 Perforation Treatment Performed - Jet Perforation
1980-06-07 Perforation Treatment Performed - Cement Squeeze
1980-06-16 Well Mode changed to Drilled and Cased
1982-10-15 Well Began Production
1982-10-15 Well Fluid changed to Gas
1982-10-15 Well Mode changed to Flowing
1983-02-28 Well Fluid changed to Gas
1983-02-28 Well Mode changed to Suspended
1984-11-08 Well Fluid changed to Gas
1984-11-08 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-11-30 Perforation 2317.00 2321.50 7
1980-06-07 Cement Squeeze 1880.00 1885.50 0
1978-11-30 Perforation 2325.00 2329.00 7
1978-12-01 Acid Treatment 2317.00 2329.00 0
1978-12-04 Fracture 2317.00 2329.00 0
1980-02-02 Perforation 2258.50 2260.50 13
1980-02-03 Acid Treatment 2258.50 2260.50 0
1980-05-01 Cement Squeeze 2258.50 2260.50 0
1980-05-02 Perforation 1880.00 1885.50 13
1980-05-02 Acid Treatment 1880.00 1885.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 644 0.0 0.0 0.0
1982 1641 0.0 0.0 0.0
1983 2535 0.0 0.0 0.0
1984 1642 0.0 0.0 0.0
1985 1961 0.0 0.0 0.0
1988 2943 0.0 0.0 0.0
1989 4244 0.0 0.0 0.0
1990 1573 0.0 0.0 0.0
1991 699 0.0 0.0 0.0
1992 2703 0.0 0.0 0.0
1993 8093 0.0 0.0 0.0
1994 7404 0.0 0.0 0.0
1995 8106 0.0 0.0 0.0
1996 7962 0.0 0.0 0.0
1997 7163 0.0 0.0 0.0
1998 7364 0.0 0.0 0.0
1999 7449 0.0 0.0 0.0
2000 7596 0.0 0.0 0.0
2001 7718 0.0 0.0 0.0
2002 8667 0.0 0.0 0.0
2003 8716 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8514 0.0 0.0 0.0
2006 8016 0.0 0.0 0.0
2007 8652 0.0 0.0 0.0
2008 8761 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8661 0.0 0.0 0.0
2011 8735 0.0 0.0 0.0
2012 8447 0.0 0.0 0.0
2013 8736 0.0 0.0 0.0
2014 8664 0.0 0.0 0.0
2015 8526 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 7739 0.0 0.0 0.0
2018 8691 0.0 0.0 0.0
2019 8735 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References