X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365030611003

Well Details

Well ID: 0365030611003
Loading map...
Location: 00/11-06-036-03W5/3
Location Alias: 00/11-06-36-03 W5M
Location Alias 2: 00/11-06-036-03 W5/03
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 03
Section: 06
County/Municipality: Red Deer County
Well Name: GULF HZ LANAWAY 14-6-36-3
Operator Name: Cenovus Energy Inc.
License Number: 0112953
License Date: 1985-01-30
License Status: Amended
Spud Date: 1985-02-06
Final Drill Date: 1985-03-14
Well Total Depth: 3035.00 m
Surface Hole Latitude: 52.067010
Surface Hole Longitude: -114.423203

For data sources see[1][2]

Well History

Date Event
1985-01-30 Obtained License
1985-02-09 Surface Casing Operation Performed
1985-03-04 Drill Stem Test Performed
1985-03-14 Finished Drilling
1985-03-14 Well Mode changed to Drilled and Cased
1985-03-15 Well Log Performed
1985-03-17 Production Casing Operation Performed
1985-03-18 Rig Released
1985-06-09 Well Log Performed
1985-06-10 Well Log Performed
1985-06-11 Perforation Treatment Performed - Jet Perforation
1985-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-07 Well Log Performed
1985-08-23 Well Log Performed
1985-08-24 Perforation Treatment Performed - Jet Perforation
1985-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-27 Perforation Treatment Performed - Jet Perforation
1985-08-27 Well Log Performed
1985-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-08 Well Log Performed
1987-10-10 Perforation Treatment Performed - Cement Squeeze
1987-10-14 Well Log Performed
1987-10-15 Perforation Treatment Performed - Jet Perforation
1987-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-08-19 Plug Back Performed
1991-01-18 Perforation Treatment Performed - Chemical Squeeze
1991-09-26 Perforation Treatment Performed - Chemical Squeeze
1993-07-06 Well Log Performed
1993-07-07 Well Log Performed
1993-07-08 Well Log Performed
1993-07-09 Perforation Treatment Performed - Fractured
1993-07-09 Perforation Treatment Performed - Jet Perforation
1993-07-20 Perforation Treatment Performed - Fractured
1993-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-07-23 Plug Back Performed
1993-08-15 Well Began Production
1993-08-15 Well Fluid changed to Gas
1993-08-15 Well Mode changed to Flowing
1995-11-26 Well Fluid changed to Gas
1995-11-26 Well Mode changed to Abandoned and Whipstocked
1995-11-27 Perforation Treatment Performed - Cement Squeeze
1995-11-27 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-06-11 Perforation 2954.50 2956.50 13
1988-08-19 Packing Device Capped w/Cement 2896.30 2912.00 0
1991-01-18 Chemical Squeeze 2860.00 2876.00 0
1991-09-26 Chemical Squeeze 2860.00 2876.00 0
1993-07-09 Perforation 2098.00 2101.50 17
1993-07-09 Fracture 2098.00 2101.50 0
1993-07-20 Fracture 2098.00 2101.50 0
1993-07-23 Packing Device Capped w/Cement 2778.00 2784.00 0
1995-11-27 Cement Squeeze 2098.00 2101.50 0
1985-06-13 Acid Treatment 2954.50 2956.50 0
1985-08-24 Perforation 2873.00 2876.00 13
1985-08-25 Acid Treatment 2873.00 2876.00 0
1985-08-27 Perforation 2860.00 2870.00 13
1985-08-28 Acid Treatment 2860.00 2870.00 0
1987-10-10 Cement Squeeze 2954.50 2956.50 0
1987-10-15 Perforation 2947.00 2950.00 13
1987-10-18 Acid Treatment 2947.00 2950.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 2685 0.0 0.0 0.0
1994 7696 0.0 0.0 0.0
1995 6556 0.0 0.0 0.0
1998 2739 0.0 0.0 0.0
1999 8523 0.0 0.0 0.0
2000 8240 0.0 0.0 0.0
2001 8632 0.0 0.0 0.0
2002 5441 0.0 0.0 0.0

For data sources see[5]

References