X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364261606000

Well Details

Well ID: 0364261606000
Loading map...
Location: 00/06-16-036-26W4/0
Location Alias: 00/06-16-36-26 W4M
Location Alias 2: 00/06-16-036-26 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 26
Section: 16
County/Municipality: Red Deer County
Well Name: ANSCHUTZ ET AL KNEEHILL 6-16-36-26
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0082035
License Date: 1980-04-09
License Status: RecCertified
Spud Date: 1980-04-11
Final Drill Date: 1980-05-04
Well Total Depth: 2239.00 m
Surface Hole Latitude: 52.089827
Surface Hole Longitude: -113.664348

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-04-09 Obtained License
1980-05-04 Finished Drilling
1980-05-04 Well Mode changed to Drilled and Cased
1980-05-05 Drill Stem Test Performed
1980-05-06 Drill Stem Test Performed
1980-05-10 Drill Stem Test Performed
1980-05-13 Production Casing Operation Performed
1980-06-18 Perforation Treatment Performed - Jet Perforation
1980-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-01 Perforation Treatment Performed - Cement Squeeze
1980-07-06 Perforation Treatment Performed - Jet Perforation
1980-07-07 Perforation Treatment Performed - Fractured
1980-07-25 Well Began Production
1980-07-25 Well Fluid changed to Crude Oil
1980-07-25 Well Mode changed to Pumping
1982-04-01 Well Fluid changed to Crude Oil
1982-04-01 Well Mode changed to Suspended
1985-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-08-18 Plug Back Performed
1985-08-18 Well Fluid changed to Crude Oil
1985-08-18 Well Mode changed to Abandoned Zone
1985-08-20 Perforation Treatment Performed - Jet Perforation
1985-08-27 Perforation Treatment Performed - Fractured
1988-11-06 Well Log Performed
1988-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-11-07 Plug Back Performed
1988-11-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-06-18 Perforation 2221.00 2224.00 13
1988-11-07 Packing Device Capped w/Cement 1593.30 1601.30 0
1980-06-20 Acid Treatment 2221.00 2224.00 0
1980-06-21 Acid Treatment 2221.00 2224.00 0
1980-07-01 Cement Squeeze 2221.00 2224.00 0
1980-07-06 Perforation 2186.00 2188.00 13
1980-07-07 Fracture 2186.00 2188.00 0
1985-08-18 Packing Device Capped w/Cement 2139.60 2150.00 0
1985-08-20 Perforation 1604.50 1610.00 13
1985-08-27 Fracture 1604.50 1610.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 48 0.0 0.0 0.0

For data sources see[5]

References