If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364261016000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.080421,"lon":-113.634931,"icon":""}]} |
Location: 00/16-10-036-26W4/0 | |
Location Alias: 00/16-10-36-26 W4M | |
Location Alias 2: 00/16-10-036-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 26 | |
Section: 10 | |
County/Municipality: Red Deer County | |
Well Name: EMBER THREEHCK 16-10-36-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0316785 | |
License Date: 2004-10-15 | |
License Status: Issued | |
Spud Date: 2004-12-13 | |
Final Drill Date: 2004-12-14 | |
Well Total Depth: 972.00 m | |
Surface Hole Latitude: 52.080421 | |
Surface Hole Longitude: -113.634931 |
Date | Event |
---|---|
2004-10-15 | Obtained License |
2004-12-13 | Direction Drilling Operation Performed - Deviate |
2004-12-13 | Lost Circulation Occurred |
2004-12-14 | Finished Drilling |
2004-12-14 | Surface Casing Operation Performed |
2004-12-14 | Well Mode changed to Drilled and Cased |
2004-12-15 | Production Casing Operation Performed |
2004-12-15 | Rig Released |
2004-12-29 | Well Log Performed |
2005-02-13 | Perforation Treatment Performed - Jet Perforation |
2005-02-15 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-02-15 | Well Mode changed to Testing |
2005-02-24 | Perforation Treatment Performed - Jet Perforation |
2005-02-25 | Perforation Treatment Performed - Jet Perforation |
2005-03-02 | Perforation Treatment Performed - Fractured |
2005-04-01 | Well Began Production |
2005-04-01 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-04-01 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2004-12-13 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-02-13 | Perforation | 731.00 | 732.00 | 20 |
2005-02-24 | Perforation | 836.20 | 836.70 | 13 |
2005-02-24 | Perforation | 822.90 | 823.40 | 13 |
2005-02-24 | Perforation | 794.30 | 794.80 | 13 |
2005-02-24 | Perforation | 789.40 | 790.40 | 13 |
2005-02-24 | Perforation | 782.20 | 784.20 | 13 |
2005-02-24 | Perforation | 767.60 | 768.10 | 13 |
2005-02-24 | Perforation | 762.60 | 763.10 | 13 |
2005-02-24 | Perforation | 759.00 | 759.50 | 13 |
2005-02-24 | Perforation | 715.20 | 716.20 | 13 |
2005-02-24 | Perforation | 703.00 | 703.50 | 13 |
2005-02-13 | Perforation | 681.00 | 682.00 | 20 |
2005-02-24 | Perforation | 698.50 | 699.50 | 13 |
2005-02-24 | Perforation | 696.80 | 697.30 | 13 |
2005-02-24 | Perforation | 688.30 | 688.80 | 13 |
2005-02-25 | Perforation | 627.80 | 628.30 | 13 |
2005-02-25 | Perforation | 610.40 | 610.90 | 13 |
2005-02-25 | Perforation | 386.10 | 387.10 | 13 |
2005-02-25 | Perforation | 363.50 | 364.00 | 13 |
2005-02-25 | Perforation | 355.30 | 355.80 | 13 |
2005-02-25 | Perforation | 343.90 | 344.40 | 13 |
2005-03-02 | Fracture | 343.90 | 879.00 | 0 |
2005-02-13 | Perforation | 584.00 | 586.00 | 20 |
2005-02-24 | Perforation | 878.50 | 879.00 | 13 |
2005-02-24 | Perforation | 874.30 | 874.80 | 13 |
2005-02-24 | Perforation | 867.80 | 868.30 | 13 |
2005-02-24 | Perforation | 855.80 | 856.30 | 13 |
2005-02-24 | Perforation | 848.90 | 849.40 | 13 |
2005-02-24 | Perforation | 844.60 | 846.60 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 6566 | 0.0 | 0.0 | 0.0 |
2006 | 8655 | 0.0 | 0.0 | 0.0 |
2007 | 8311 | 0.0 | 0.0 | 0.0 |
2008 | 8700 | 0.0 | 0.0 | 0.0 |
2009 | 7702 | 0.0 | 0.0 | 0.0 |
2010 | 7978 | 0.0 | 0.0 | 0.0 |
2011 | 8082 | 0.0 | 0.0 | 0.0 |
2012 | 8687 | 0.0 | 0.0 | 0.0 |
2013 | 8667 | 0.0 | 0.0 | 0.0 |
2014 | 8668 | 0.0 | 0.0 | 0.0 |
2015 | 8659 | 0.0 | 0.0 | 0.0 |
2016 | 8702 | 0.0 | 0.0 | 0.0 |
2017 | 8490 | 0.0 | 0.0 | 0.0 |
2018 | 8306 | 0.0 | 0.0 | 0.0 |
2019 | 8632 | 0.0 | 0.0 | 0.0 |
2020 | 2142 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2004-12-13 | Lost Circulation | 46.00 | 221.00 |
For data sources see[7]