X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364251808000

Well Details

Well ID: 0364251808000
Loading map...
Location: 00/08-18-036-25W4/0
Location Alias: 00/08-18-36-25 W4M
Location Alias 2: 00/08-18-036-25 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 25
Section: 18
County/Municipality: Red Deer County
Well Name: SOC THREEHCK 8-18-36-25
Operator Name: AlphaBow Energy Ltd.
License Number: 0197158
License Date: 1997-01-24
License Status: Issued
Spud Date: 1997-02-15
Final Drill Date: 1997-02-19
Well Total Depth: 1823.00 m
Surface Hole Latitude: 52.088935
Surface Hole Longitude: -113.553821

For data sources see[1][2]

Well History

Date Event
1997-01-24 Obtained License
1997-02-15 Lost Circulation Occurred
1997-02-16 Surface Casing Operation Performed
1997-02-19 Finished Drilling
1997-02-19 Well Log Performed
1997-02-19 Well Mode changed to Drilled and Cased
1997-02-21 Production Casing Operation Performed
1997-02-21 Rig Released
1997-03-09 Perforation Treatment Performed - Jet Perforation
1997-03-09 Well Log Performed
1997-03-11 Perforation Treatment Performed - Fractured
1997-03-16 Perforation Treatment Performed - Jet Perforation
1997-03-16 Well Log Performed
1997-03-18 Perforation Treatment Performed - Fractured
1997-03-27 Well Began Production
1997-03-27 Well Fluid changed to Crude Oil
1997-03-27 Well Mode changed to Pumping
1998-05-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-05-10 Perforation Treatment Performed - Jet Perforation
1998-05-10 Plug Back Performed
1998-05-10 Well Fluid changed to Crude Oil
1998-05-10 Well Log Performed
1998-05-10 Well Mode changed to Abandoned Zone
1998-05-12 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-03-09 Perforation 1603.00 1607.00 17
1997-03-11 Fracture 1603.00 1607.00 0
1997-03-16 Perforation 1588.00 1592.00 18
1997-03-18 Fracture 1588.00 1592.00 0
1998-05-10 Packing Device Capped w/Cement 1568.80 1576.80 0
1998-05-10 Perforation 1002.00 1006.00 17
1998-05-12 Fracture 1002.00 1006.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 6211 0.0 0.0 0.0
1998 1631 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-02-15 Lost Circulation 50.00 60.00

For data sources see[6]

References