X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364241311020

Well Details

Well ID: 0364241311020
Loading map...
Location: 02/11-13-036-24W4/0
Location Alias: 02/11-13-36-24 W4M
Location Alias 2: 02/11-13-036-24 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 24
Section: 13
County/Municipality: Red Deer County
Well Name: EMBER 102 HZ MIKWAN 11-13-36-24
Operator Name: Ember Resources Inc.
License Number: 0377833
License Date: 2007-06-05
License Status: Issued
Spud Date: 2007-07-21
Final Drill Date: 2007-08-03
Well Total Depth: 2673.00 m
Surface Hole Latitude: 52.086498
Surface Hole Longitude: -113.292475

For data sources see[1][2]

Well History

Date Event
2007-06-05 Obtained License
2007-07-21 Direction Drilling Operation Performed - Horizontal
2007-07-22 Surface Casing Operation Performed
2007-07-28 Intermediate Casing Operation Performed
2007-08-03 Finished Drilling
2007-08-03 Well Log Performed
2007-08-03 Well Mode changed to Drilled and Cased
2007-08-04 Well Log Performed
2007-08-05 Liner Casing Operation Performed
2007-08-05 Perforation Treatment Performed - Slotted Liner or Casing
2007-08-05 Rig Released
2007-08-14 Well Log Performed
2007-08-19 Perforation Treatment Performed - Fractured
2007-09-08 Well Fluid changed to Coalbed Methane-Coals Only
2007-09-08 Well Mode changed to Testing
2007-10-12 Well Began Production
2007-10-12 Well Fluid changed to Coalbed Methane-Coals Only
2007-10-12 Well Mode changed to Flowing
2017-01-23 Well Fluid changed to Coalbed Methane-Coals Only
2017-01-23 Well Mode changed to Suspended
2017-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-01-24 Plug Back Performed
2017-01-24 Well Fluid changed to Coalbed Methane-Coals Only
2017-01-24 Well Mode changed to Abandoned Zone
2017-02-02 Well Log Performed
2017-02-24 Perforation Treatment Performed - Jet Perforation
2017-02-24 Well Log Performed
2017-03-09 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2007-07-21 1320.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-08-05 Slotted Liner 1750.00 2673.00 0
2017-02-24 Perforation 499.50 500.50 13
2017-02-24 Perforation 510.50 512.00 13
2017-02-24 Perforation 519.00 520.00 13
2017-02-24 Perforation 522.50 523.50 13
2017-02-24 Perforation 524.50 526.50 13
2017-02-24 Perforation 536.50 538.50 13
2017-02-24 Perforation 566.00 568.00 13
2017-02-24 Perforation 576.50 578.00 13
2017-02-24 Perforation 601.00 604.00 13
2017-02-24 Perforation 613.00 614.00 13
2007-08-19 Fracture 1750.00 2673.00 0
2017-02-24 Perforation 662.00 663.50 13
2017-03-09 Fracture 333.00 334.00 0
2017-03-09 Fracture 428.00 429.00 0
2017-03-09 Fracture 477.50 480.00 0
2017-03-09 Fracture 485.00 486.50 0
2017-03-09 Fracture 493.50 495.00 0
2017-03-09 Fracture 498.00 499.00 0
2017-03-09 Fracture 499.50 500.50 0
2017-03-09 Fracture 510.50 512.00 0
2017-03-09 Fracture 519.00 520.00 0
2017-01-24 Packing Device Capped w/Cement 1619.90 1634.80 0
2017-03-09 Fracture 522.50 523.50 0
2017-03-09 Fracture 524.50 526.50 0
2017-03-09 Fracture 536.50 538.50 0
2017-03-09 Fracture 566.00 568.00 0
2017-03-09 Fracture 576.50 578.00 0
2017-03-09 Fracture 601.00 604.00 0
2017-03-09 Fracture 613.00 614.00 0
2017-02-24 Perforation 333.00 334.00 13
2017-02-24 Perforation 428.00 429.00 13
2017-02-24 Perforation 477.50 480.00 13
2017-02-24 Perforation 485.00 486.50 13
2017-02-24 Perforation 493.50 495.00 13
2017-02-24 Perforation 498.00 499.00 13

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-03-09 2017-03-09 1,634 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 100 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 690 0.0 0.0 0.0
2008 6763 0.0 0.0 0.0
2009 8378 0.0 0.0 0.0
2010 8570 0.0 0.0 0.0
2011 6400 0.0 0.0 0.0
2012 5739 0.0 0.0 0.0
2013 861 0.0 0.0 0.0
2014 315 0.0 0.0 0.0
2015 1690 0.0 0.0 0.0
2016 1728 0.0 0.0 0.0
2017 325 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-09 No Incident Encountered 0.00 0.00

For data sources see[8]

References