If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364241103003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.071074,"lon":-113.331522,"icon":""}]} |
Location: 00/03-11-036-24W4/3 | |
Location Alias: 00/03-11-36-24 W4M | |
Location Alias 2: 00/03-11-036-24 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 24 | |
Section: 11 | |
County/Municipality: Red Deer County | |
Well Name: EMBER HUXLEY 3-11-36-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0311127 | |
License Date: 2004-06-30 | |
License Status: Issued | |
Spud Date: 2004-07-31 | |
Final Drill Date: 2004-08-13 | |
Well Total Depth: 1773.00 m | |
Surface Hole Latitude: 52.071074 | |
Surface Hole Longitude: -113.331522 |
Date | Event |
---|---|
2004-06-30 | Obtained License |
2004-08-03 | Surface Casing Operation Performed |
2004-08-13 | Finished Drilling |
2004-08-13 | Well Mode changed to Drilled and Cased |
2004-08-14 | Well Log Performed |
2004-08-15 | Production Casing Operation Performed |
2004-08-15 | Rig Released |
2004-09-01 | Perforation Treatment Performed - Jet Perforation |
2004-09-01 | Well Log Performed |
2004-09-02 | Well Log Performed |
2004-09-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-09-03 | Perforation Treatment Performed - Jet Perforation |
2004-09-03 | Plug Back Performed |
2004-09-03 | Well Log Performed |
2004-09-06 | Perforation Treatment Performed - Fractured |
2005-06-06 | Well Log Performed |
2007-09-11 | Well Log Performed |
2008-07-04 | Well Log Performed |
2009-09-09 | Well Log Performed |
2010-08-29 | Well Log Performed |
2012-08-10 | Perforation Treatment Performed - Jet Perforation |
2012-08-10 | Well Log Performed |
2012-08-13 | Perforation Treatment Performed - Jet Perforation |
2012-08-13 | Well Log Performed |
2012-08-15 | Well Began Production |
2012-08-15 | Well Fluid changed to Crude Oil |
2012-08-15 | Well Mode changed to Flowing |
2012-08-31 | Well Fluid changed to Crude Oil |
2012-08-31 | Well Mode changed to Suspended |
2012-09-05 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-09-01 | Perforation | 1698.50 | 1699.10 | 20 |
2004-09-03 | Perforation | 568.90 | 569.40 | 13 |
2004-09-03 | Perforation | 557.40 | 558.00 | 13 |
2004-09-03 | Perforation | 536.80 | 539.70 | 13 |
2004-09-03 | Perforation | 528.40 | 528.70 | 13 |
2004-09-03 | Perforation | 522.60 | 524.00 | 13 |
2004-09-03 | Perforation | 508.10 | 508.50 | 13 |
2004-09-03 | Perforation | 499.90 | 500.30 | 13 |
2004-09-03 | Perforation | 496.90 | 497.40 | 13 |
2004-09-03 | Perforation | 490.50 | 491.30 | 13 |
2004-09-03 | Perforation | 483.10 | 483.80 | 13 |
2004-09-01 | Perforation | 1699.00 | 1699.10 | 20 |
2004-09-03 | Perforation | 466.30 | 466.60 | 13 |
2004-09-03 | Perforation | 455.60 | 456.00 | 13 |
2004-09-06 | Fracture | 455.60 | 616.40 | 0 |
2012-08-10 | Perforation | 1661.00 | 1663.00 | 17 |
2012-08-13 | Perforation | 1479.50 | 1483.00 | 17 |
2012-08-13 | Perforation | 1483.00 | 1487.00 | 17 |
2004-09-01 | Perforation | 1689.50 | 1690.00 | 20 |
2004-09-03 | Packing Device Capped w/Cement | 1667.00 | 1675.00 | 0 |
2004-09-03 | Perforation | 616.00 | 616.40 | 13 |
2004-09-03 | Perforation | 613.40 | 614.00 | 13 |
2004-09-03 | Perforation | 604.50 | 605.10 | 13 |
2004-09-03 | Perforation | 595.00 | 597.50 | 13 |
2004-09-03 | Perforation | 583.20 | 583.70 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 43 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-09-05 | No Incident Encountered | 0.00 | 0.00 |
2012-09-05 | No Incident Encountered | 0.00 | 0.00 |
2012-09-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]