X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364233309000

Well Details

Well ID: 0364233309000
Loading map...
Location: 00/09-33-036-23W4/0
Location Alias: 00/09-33-36-23 W4M
Location Alias 2: 00/09-33-036-23 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 23
Section: 33
County/Municipality: Red Deer County
Well Name: EMBER MIKWAN 9-33-36-23
Operator Name: Ember Resources Inc.
License Number: 0406174
License Date: 2008-12-15
License Status: Issued
Spud Date: 2009-01-28
Final Drill Date: 2009-01-30
Well Total Depth: 885.00 m
Surface Hole Latitude: 52.138733
Surface Hole Longitude: -113.223914

For data sources see[1][2]

Well History

Date Event
2008-12-15 Obtained License
2009-01-28 Lost Circulation Occurred
2009-01-28 Surface Casing Operation Performed
2009-01-30 Finished Drilling
2009-01-30 Well Mode changed to Drilled and Cased
2009-01-31 Production Casing Operation Performed
2009-01-31 Rig Released
2009-02-04 Well Log Performed
2009-02-18 Perforation Treatment Performed - Jet Perforation
2009-02-26 Perforation Treatment Performed - Jet Perforation
2009-02-28 Perforation Treatment Performed - Fractured
2009-03-03 Well Fluid changed to Coalbed Methane-Coals and Other
2009-03-03 Well Mode changed to Testing
2009-03-17 Well Began Production
2009-03-17 Well Fluid changed to Coalbed Methane-Coals and Other
2009-03-17 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-18 Perforation 580.00 583.00 20
2009-02-26 Perforation 545.70 546.20 13
2009-02-26 Perforation 543.20 544.70 13
2009-02-26 Perforation 539.40 540.40 13
2009-02-26 Perforation 526.50 527.00 13
2009-02-26 Perforation 523.50 524.00 13
2009-02-26 Perforation 514.40 515.40 13
2009-02-26 Perforation 511.90 512.40 13
2009-02-26 Perforation 507.00 508.00 13
2009-02-26 Perforation 497.00 497.50 13
2009-02-26 Perforation 495.00 495.50 13
2009-02-18 Perforation 570.50 571.50 20
2009-02-26 Perforation 469.00 470.50 13
2009-02-26 Perforation 465.50 467.50 13
2009-02-26 Perforation 459.00 460.50 13
2009-02-26 Perforation 452.90 453.40 13
2009-02-26 Perforation 449.10 449.60 13
2009-02-26 Perforation 445.40 445.90 13
2009-02-26 Perforation 428.30 429.80 13
2009-02-26 Perforation 420.50 421.00 13
2009-02-26 Perforation 413.50 414.50 13
2009-02-26 Perforation 407.10 408.10 13
2009-02-18 Perforation 479.00 481.00 13
2009-02-26 Perforation 360.00 360.50 13
2009-02-26 Perforation 346.70 347.20 13
2009-02-28 Fracture 346.70 546.20 0
2009-02-18 Perforation 366.00 367.00 13
2009-02-18 Perforation 334.00 336.00 13
2009-02-18 Perforation 301.00 302.00 13
2009-02-18 Perforation 280.00 281.00 13
2009-02-18 Perforation 267.00 268.00 13
2009-02-18 Perforation 262.00 264.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 6638 0.0 0.0 0.0
2010 8365 0.0 0.0 0.0
2011 8631 0.0 0.0 0.0
2012 8780 0.0 0.0 0.0
2013 8751 0.0 0.0 0.0
2014 8707 0.0 0.0 0.0
2015 8746 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-01-28 Lost Circulation 12.00 22.00

For data sources see[6]

References