X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364231510022

Well Details

Well ID: 0364231510022
Loading map...
Location: 02/10-15-036-23W4/2
Location Alias: 02/10-15-36-23 W4M
Location Alias 2: 02/10-15-036-23 W4/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 23
Section: 15
County/Municipality: Red Deer County
Well Name: EMBER 102 MIKWAN 10-15-36-23
Operator Name: Ember Resources Inc.
License Number: 0425360
License Date: 2010-11-01
License Status: Issued
Spud Date: 2010-12-16
Final Drill Date: 2010-12-30
Well Total Depth: 903.00 m
Surface Hole Latitude: 52.093039
Surface Hole Longitude: -113.206720

For data sources see[1][2]

Well History

Date Event
2010-11-01 Obtained License
2010-12-16 Lost Circulation Occurred
2010-12-16 Surface Casing Operation Performed
2010-12-30 Finished Drilling
2010-12-30 Production Casing Operation Performed
2010-12-30 Rig Released
2010-12-30 Well Mode changed to Drilled and Cased
2011-01-08 Well Log Performed
2011-02-24 Perforation Treatment Performed - Jet Perforation
2011-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-04 Perforation Treatment Performed - Jet Perforation
2011-03-04 Plug Back Performed
2011-08-25 Perforation Treatment Performed - Fractured
2011-09-02 Well Began Production
2011-09-02 Well Fluid changed to Coalbed Methane-Coals Only
2011-09-02 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-24 Perforation 825.80 830.80 13
2011-03-04 Perforation 506.30 507.30 13
2011-03-04 Perforation 494.30 495.30 13
2011-03-04 Perforation 467.70 471.20 13
2011-03-04 Perforation 459.80 460.80 13
2011-03-04 Perforation 456.80 459.30 13
2011-03-04 Perforation 454.90 455.90 13
2011-03-04 Perforation 444.70 446.20 13
2011-03-04 Perforation 441.70 442.70 13
2011-03-04 Perforation 434.40 434.90 13
2011-03-04 Perforation 431.50 432.00 13
2011-03-04 Packing Device Capped w/Cement 815.00 823.00 0
2011-03-04 Perforation 428.90 429.90 13
2011-03-04 Perforation 423.50 425.50 13
2011-03-04 Perforation 416.30 417.80 13
2011-03-04 Perforation 410.20 411.70 13
2011-03-04 Perforation 407.60 408.60 13
2011-03-04 Perforation 395.10 396.10 13
2011-03-04 Perforation 383.00 384.00 13
2011-03-04 Perforation 376.80 377.30 13
2011-03-04 Perforation 358.40 359.40 13
2011-03-04 Perforation 356.80 357.80 13
2011-03-04 Perforation 562.90 564.40 13
2011-03-04 Perforation 349.40 349.90 13
2011-03-04 Perforation 345.00 346.50 13
2011-03-04 Perforation 340.00 340.50 13
2011-03-04 Perforation 312.00 313.00 13
2011-03-04 Perforation 286.10 287.10 13
2011-03-04 Perforation 284.50 285.50 13
2011-03-04 Perforation 283.50 284.00 13
2011-08-25 Fracture 283.50 564.40 0
2011-03-04 Perforation 543.60 545.10 13
2011-03-04 Perforation 540.20 540.70 13
2011-03-04 Perforation 526.20 527.70 13
2011-03-04 Perforation 523.00 524.00 13
2011-03-04 Perforation 513.90 515.40 13
2011-03-04 Perforation 511.60 512.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2904 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8751 0.0 0.0 0.0
2014 8707 0.0 0.0 0.0
2015 8746 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-12-16 Lost Circulation 43.00 50.00

For data sources see[6]

References