If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364231201002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.072982,"lon":-113.152208,"icon":""}]} |
Location: 00/01-12-036-23W4/2 | |
Location Alias: 00/01-12-36-23 W4M | |
Location Alias 2: 00/01-12-036-23 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 23 | |
Section: 12 | |
County/Municipality: Red Deer County | |
Well Name: EMBER MIKWAN 1-12-36-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0325992 | |
License Date: 2005-02-09 | |
License Status: Amended | |
Spud Date: 2005-03-22 | |
Final Drill Date: 2005-03-25 | |
Well Total Depth: 886.00 m | |
Surface Hole Latitude: 52.072982 | |
Surface Hole Longitude: -113.152208 |
Date | Event |
---|---|
2005-02-09 | Obtained License |
2005-03-23 | Surface Casing Operation Performed |
2005-03-25 | Finished Drilling |
2005-03-25 | Well Mode changed to Drilled and Cased |
2005-03-26 | Production Casing Operation Performed |
2005-03-26 | Rig Released |
2005-04-09 | Well Log Performed |
2005-09-26 | Perforation Treatment Performed - Jet Perforation |
2005-10-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-10-07 | Perforation Treatment Performed - Jet Perforation |
2005-10-07 | Plug Back Performed |
2005-10-26 | Perforation Treatment Performed - Fractured |
2005-11-01 | Well Log Performed |
2005-12-20 | Well Began Production |
2005-12-20 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-12-20 | Well Mode changed to Flowing |
2007-09-07 | Well Log Performed |
2008-10-08 | Well Log Performed |
2009-02-11 | Well Log Performed |
2010-02-04 | Well Log Performed |
2010-08-25 | Perforation Treatment Performed - Jet Perforation |
2010-10-20 | Well Log Performed |
2011-10-05 | Well Log Performed |
2012-12-11 | Well Log Performed |
2013-10-03 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-09-26 | Perforation | 711.50 | 712.50 | 17 |
2005-10-07 | Perforation | 484.50 | 484.90 | 17 |
2005-10-07 | Perforation | 476.70 | 477.00 | 17 |
2005-10-07 | Perforation | 452.60 | 453.80 | 17 |
2005-10-07 | Perforation | 445.90 | 446.40 | 17 |
2005-10-07 | Perforation | 438.90 | 441.30 | 17 |
2005-10-07 | Perforation | 416.10 | 416.50 | 17 |
2005-10-07 | Perforation | 410.60 | 411.30 | 17 |
2005-10-07 | Perforation | 402.30 | 403.50 | 17 |
2005-10-07 | Perforation | 396.80 | 397.50 | 17 |
2005-10-07 | Perforation | 394.00 | 395.80 | 17 |
2005-09-26 | Perforation | 640.50 | 642.00 | 17 |
2005-10-07 | Perforation | 351.90 | 352.50 | 17 |
2005-10-07 | Perforation | 303.50 | 303.90 | 17 |
2005-10-07 | Perforation | 300.10 | 300.60 | 17 |
2005-10-07 | Perforation | 275.00 | 275.30 | 17 |
2005-10-26 | Fracture | 275.00 | 554.50 | 0 |
2010-08-25 | Perforation | 169.50 | 170.50 | 14 |
2010-08-25 | Perforation | 180.50 | 182.70 | 14 |
2005-09-26 | Perforation | 599.00 | 600.00 | 17 |
2005-10-07 | Packing Device Capped w/Cement | 587.00 | 595.00 | 0 |
2005-10-07 | Perforation | 554.10 | 554.50 | 17 |
2005-10-07 | Perforation | 536.10 | 537.40 | 17 |
2005-10-07 | Perforation | 516.80 | 518.10 | 17 |
2005-10-07 | Perforation | 514.10 | 514.90 | 17 |
2005-10-07 | Perforation | 506.00 | 508.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 308 | 0.0 | 0.0 | 0.0 |
2006 | 7506 | 0.0 | 0.0 | 0.0 |
2007 | 8520 | 0.0 | 0.0 | 0.0 |
2008 | 8559 | 0.0 | 0.0 | 0.0 |
2009 | 8590 | 0.0 | 0.0 | 0.0 |
2010 | 8067 | 0.0 | 0.0 | 0.0 |
2011 | 8750 | 0.0 | 0.0 | 0.0 |
2012 | 8735 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 4167 | 0.0 | 0.0 | 0.0 |
2020 | 2145 | 0.0 | 0.0 | 0.0 |
For data sources see[5]