If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364230711022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.07923,"lon":-113.281975,"icon":""}]} |
Location: 02/11-07-036-23W4/2 | |
Location Alias: 02/11-07-36-23 W4M | |
Location Alias 2: 02/11-07-036-23 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 23 | |
Section: 07 | |
County/Municipality: Red Deer County | |
Well Name: SCOLLARD MIKWAN 11-7-36-23 | |
Operator Name: Scollard Energy Ltd. | |
License Number: 0267815 | |
License Date: 2002-02-15 | |
License Status: Abandoned | |
Spud Date: 2002-02-14 | |
Final Drill Date: 2002-02-21 | |
Well Total Depth: 1721.50 m | |
Surface Hole Latitude: 52.079230 | |
Surface Hole Longitude: -113.281975 |
Date | Event |
---|---|
2002-02-15 | Obtained License |
2002-02-15 | Surface Casing Operation Performed |
2002-02-21 | Finished Drilling |
2002-02-21 | Well Mode changed to Drilled and Cased |
2002-02-23 | Production Casing Operation Performed |
2002-02-23 | Rig Released |
2002-03-21 | Well Log Performed |
2002-06-06 | Perforation Treatment Performed - Jet Perforation |
2002-06-06 | Well Log Performed |
2003-07-25 | Perforation Treatment Performed - Jet Perforation |
2003-07-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-07-26 | Plug Back Performed |
2003-09-13 | Well Began Production |
2003-09-13 | Well Fluid changed to Gas |
2003-09-13 | Well Mode changed to Flowing |
2004-02-27 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
2004-02-27 | Perforation Treatment Performed - Jet Perforation |
2004-02-29 | Perforation Treatment Performed - Cement Squeeze |
2004-03-02 | Perforation Treatment Performed - Jet Perforation |
2004-03-03 | Perforation Treatment Performed - Fractured |
2005-10-01 | Well Fluid changed to Gas |
2005-10-01 | Well Mode changed to Suspended |
2006-02-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-02-28 | Perforation Treatment Performed - Cement Plug |
2006-02-28 | Perforation Treatment Performed - Jet Perforation |
2006-02-28 | Plug Back Performed |
2006-02-28 | Well Fluid changed to Gas |
2006-02-28 | Well Mode changed to Abandoned Zone |
2006-03-01 | Perforation Treatment Performed - Cement Squeeze |
2006-03-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-03-02 | Perforation Treatment Performed - Cement Plug |
2006-03-02 | Perforation Treatment Performed - Jet Perforation |
2006-03-02 | Plug Back Performed |
2006-03-03 | Perforation Treatment Performed - Cement Squeeze |
2006-03-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-03-04 | Perforation Treatment Performed - Cement Plug |
2006-03-04 | Perforation Treatment Performed - Jet Perforation |
2006-03-04 | Plug Back Performed |
2006-03-07 | Perforation Treatment Performed - Cement Squeeze |
2006-03-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-03-08 | Perforation Treatment Performed - Cement Plug |
2006-03-08 | Perforation Treatment Performed - Cement Squeeze |
2006-03-08 | Perforation Treatment Performed - Jet Perforation |
2006-03-08 | Plug Back Performed |
2006-03-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-03-10 | Perforation Treatment Performed - Cement Squeeze |
2006-03-10 | Perforation Treatment Performed - Jet Perforation |
2006-03-10 | Plug Back Performed |
2006-03-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-03-11 | Plug Back Performed |
2006-06-30 | Well Abandoned |
2006-06-30 | Well Fluid changed to Gas |
2006-06-30 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-06-06 | Perforation | 1627.00 | 1628.00 | 17 |
2006-02-28 | Packing Device Capped w/Cement | 655.00 | 663.00 | 0 |
2006-02-28 | Perforation | 590.00 | 591.00 | 14 |
2006-03-01 | Cement Squeeze | 590.00 | 591.00 | 0 |
2006-03-02 | Cement Plug | 558.00 | 590.00 | 0 |
2006-03-02 | Packing Device Capped w/Cement | 550.00 | 558.00 | 0 |
2006-03-02 | Perforation | 490.00 | 491.00 | 17 |
2006-03-03 | Cement Squeeze | 490.00 | 491.00 | 0 |
2006-03-04 | Cement Plug | 485.00 | 490.00 | 0 |
2006-03-04 | Packing Device Capped w/Cement | 472.00 | 480.00 | 0 |
2006-03-04 | Perforation | 409.00 | 410.00 | 17 |
2003-07-25 | Perforation | 665.50 | 668.00 | 17 |
2006-03-07 | Cement Squeeze | 409.00 | 410.00 | 0 |
2006-03-08 | Cement Plug | 374.00 | 426.00 | 0 |
2006-03-08 | Perforation | 372.00 | 373.00 | 17 |
2006-03-08 | Cement Squeeze | 372.00 | 373.00 | 0 |
2006-03-08 | Packing Device Capped w/Cement | 347.00 | 360.00 | 0 |
2006-03-10 | Perforation | 304.00 | 305.00 | 17 |
2006-03-10 | Cement Squeeze | 304.00 | 305.00 | 0 |
2006-03-10 | Packing Device Capped w/Cement | 286.00 | 294.00 | 0 |
2006-03-10 | Perforation | 220.00 | 221.00 | 17 |
2006-03-10 | Cement Squeeze | 220.00 | 221.00 | 0 |
2003-07-26 | Packing Device Capped w/Cement | 1617.00 | 1625.00 | 0 |
2006-03-11 | Packing Device Capped w/Cement | 207.00 | 215.00 | 0 |
2004-02-27 | Perforation | 674.00 | 675.00 | 17 |
2004-02-27 | Casing Patch | 665.50 | 668.00 | 0 |
2004-02-29 | Cement Squeeze | 674.00 | 675.00 | 0 |
2004-03-02 | Perforation | 665.50 | 668.00 | 20 |
2004-03-03 | Fracture | 665.50 | 668.00 | 0 |
2006-02-28 | Cement Plug | 669.00 | 672.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 7647 | 0.0 | 0.0 | 0.0 |
For data sources see[5]