X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364230711020

Well Details

Well ID: 0364230711020
Loading map...
Location: 02/11-07-036-23W4/0
Location Alias: 02/11-07-36-23 W4M
Location Alias 2: 02/11-07-036-23 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 23
Section: 07
County/Municipality: Red Deer County
Well Name: SCOLLARD MIKWAN 11-7-36-23
Operator Name: Scollard Energy Ltd.
License Number: 0267815
License Date: 2002-02-15
License Status: Abandoned
Spud Date: 2002-02-14
Final Drill Date: 2002-02-21
Well Total Depth: 1721.50 m
Surface Hole Latitude: 52.079230
Surface Hole Longitude: -113.281975

For data sources see[1][2]

Well History

Date Event
2002-02-15 Obtained License
2002-02-15 Surface Casing Operation Performed
2002-02-21 Finished Drilling
2002-02-23 Production Casing Operation Performed
2002-02-23 Rig Released
2002-02-23 Well Mode changed to Drilled and Cased
2002-03-21 Well Log Performed
2002-06-06 Perforation Treatment Performed - Jet Perforation
2002-06-06 Well Log Performed
2002-08-01 Well Began Production
2002-08-01 Well Fluid changed to Gas
2002-08-01 Well Mode changed to Flowing
2003-07-25 Perforation Treatment Performed - Jet Perforation
2003-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-26 Plug Back Performed
2003-07-26 Well Fluid changed to Gas
2003-07-26 Well Mode changed to Abandoned Zone
2004-02-27 Perforation Treatment Performed - Casing Patch (Over Perfs)
2004-02-27 Perforation Treatment Performed - Jet Perforation
2004-02-29 Perforation Treatment Performed - Cement Squeeze
2004-03-02 Perforation Treatment Performed - Jet Perforation
2004-03-03 Perforation Treatment Performed - Fractured
2006-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-28 Perforation Treatment Performed - Cement Plug
2006-02-28 Perforation Treatment Performed - Jet Perforation
2006-02-28 Plug Back Performed
2006-03-01 Perforation Treatment Performed - Cement Squeeze
2006-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-02 Perforation Treatment Performed - Cement Plug
2006-03-02 Perforation Treatment Performed - Jet Perforation
2006-03-02 Plug Back Performed
2006-03-03 Perforation Treatment Performed - Cement Squeeze
2006-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-04 Perforation Treatment Performed - Cement Plug
2006-03-04 Perforation Treatment Performed - Jet Perforation
2006-03-04 Plug Back Performed
2006-03-07 Perforation Treatment Performed - Cement Squeeze
2006-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-08 Perforation Treatment Performed - Cement Plug
2006-03-08 Perforation Treatment Performed - Cement Squeeze
2006-03-08 Perforation Treatment Performed - Jet Perforation
2006-03-08 Plug Back Performed
2006-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-10 Perforation Treatment Performed - Cement Squeeze
2006-03-10 Perforation Treatment Performed - Jet Perforation
2006-03-10 Plug Back Performed
2006-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-11 Plug Back Performed
2006-06-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-06-06 Perforation 1627.00 1628.00 17
2006-02-28 Packing Device Capped w/Cement 655.00 663.00 0
2006-02-28 Perforation 590.00 591.00 14
2006-03-01 Cement Squeeze 590.00 591.00 0
2006-03-02 Cement Plug 558.00 590.00 0
2006-03-02 Packing Device Capped w/Cement 550.00 558.00 0
2006-03-02 Perforation 490.00 491.00 17
2006-03-03 Cement Squeeze 490.00 491.00 0
2006-03-04 Cement Plug 485.00 490.00 0
2006-03-04 Packing Device Capped w/Cement 472.00 480.00 0
2006-03-04 Perforation 409.00 410.00 17
2003-07-25 Perforation 665.50 668.00 17
2006-03-07 Cement Squeeze 409.00 410.00 0
2006-03-08 Cement Plug 374.00 426.00 0
2006-03-08 Perforation 372.00 373.00 17
2006-03-08 Cement Squeeze 372.00 373.00 0
2006-03-08 Packing Device Capped w/Cement 347.00 360.00 0
2006-03-10 Perforation 304.00 305.00 17
2006-03-10 Cement Squeeze 304.00 305.00 0
2006-03-10 Packing Device Capped w/Cement 286.00 294.00 0
2006-03-10 Perforation 220.00 221.00 17
2006-03-10 Cement Squeeze 220.00 221.00 0
2003-07-26 Packing Device Capped w/Cement 1617.00 1625.00 0
2006-03-11 Packing Device Capped w/Cement 207.00 215.00 0
2004-02-27 Perforation 674.00 675.00 17
2004-02-27 Casing Patch 665.50 668.00 0
2004-02-29 Cement Squeeze 674.00 675.00 0
2004-03-02 Perforation 665.50 668.00 20
2004-03-03 Fracture 665.50 668.00 0
2006-02-28 Cement Plug 669.00 672.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 3524 0.0 0.0 0.0
2003 4599 0.0 0.0 0.0

For data sources see[5]

References