If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364223512000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.139731,"lon":-113.047313,"icon":""}]} |
Location: 00/12-35-036-22W4/0 | |
Location Alias: 00/12-35-36-22 W4M | |
Location Alias 2: 00/12-35-036-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 22 | |
Section: 35 | |
County/Municipality: Red Deer County | |
Well Name: EMBER SD MIKWAN 12-35-36-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0427584 | |
License Date: 2010-12-13 | |
License Status: Issued | |
Spud Date: 2011-01-31 | |
Final Drill Date: 2011-02-02 | |
Well Total Depth: 938.00 m | |
Surface Hole Latitude: 52.139731 | |
Surface Hole Longitude: -113.047313 |
Date | Event |
---|---|
2010-12-13 | Obtained License |
2011-01-31 | Direction Drilling Operation Performed - Deviate |
2011-02-01 | Surface Casing Operation Performed |
2011-02-02 | Finished Drilling |
2011-02-02 | Production Casing Operation Performed |
2011-02-02 | Rig Released |
2011-02-02 | Well Mode changed to Drilled and Cased |
2011-02-15 | Well Log Performed |
2011-03-12 | Perforation Treatment Performed - Jet Perforation |
2011-03-13 | Perforation Treatment Performed - Jet Perforation |
2011-03-17 | Perforation Treatment Performed - Fractured |
2011-03-22 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-22 | Well Mode changed to Testing |
2011-03-28 | Well Began Production |
2011-03-28 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-28 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-01-31 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-03-12 | Perforation | 659.00 | 661.00 | 13 |
2011-03-13 | Perforation | 351.00 | 352.00 | 13 |
2011-03-13 | Perforation | 296.10 | 296.60 | 13 |
2011-03-13 | Perforation | 293.30 | 294.30 | 13 |
2011-03-13 | Perforation | 405.00 | 406.00 | 13 |
2011-03-13 | Perforation | 328.10 | 329.10 | 13 |
2011-03-13 | Perforation | 341.60 | 342.10 | 13 |
2011-03-13 | Perforation | 339.00 | 339.50 | 13 |
2011-03-13 | Perforation | 332.20 | 333.20 | 13 |
2011-03-13 | Perforation | 424.20 | 425.70 | 13 |
2011-03-13 | Perforation | 535.90 | 536.90 | 13 |
2011-03-12 | Perforation | 767.00 | 770.00 | 13 |
2011-03-13 | Perforation | 533.70 | 534.20 | 13 |
2011-03-13 | Perforation | 529.90 | 530.90 | 13 |
2011-03-13 | Perforation | 865.70 | 866.20 | 13 |
2011-03-13 | Perforation | 554.00 | 555.50 | 13 |
2011-03-13 | Perforation | 553.30 | 553.80 | 13 |
2011-03-13 | Perforation | 522.30 | 524.30 | 13 |
2011-03-13 | Perforation | 454.90 | 456.40 | 13 |
2011-03-13 | Perforation | 453.40 | 454.40 | 13 |
2011-03-13 | Perforation | 446.60 | 448.10 | 13 |
2011-03-13 | Perforation | 473.00 | 474.50 | 13 |
2011-03-13 | Perforation | 389.20 | 389.70 | 13 |
2011-03-13 | Perforation | 501.60 | 503.10 | 13 |
2011-03-13 | Perforation | 460.50 | 461.50 | 13 |
2011-03-17 | Fracture | 405.00 | 406.00 | 0 |
2011-03-17 | Fracture | 293.30 | 536.90 | 0 |
2011-03-17 | Fracture | 553.30 | 555.50 | 0 |
2011-03-17 | Fracture | 865.70 | 866.20 | 0 |
2011-03-13 | Perforation | 385.80 | 386.80 | 13 |
2011-03-13 | Perforation | 356.70 | 357.20 | 13 |
2011-03-13 | Perforation | 398.40 | 399.90 | 13 |
2011-03-13 | Perforation | 414.90 | 418.90 | 13 |
2011-03-13 | Perforation | 411.50 | 413.00 | 13 |
2011-03-13 | Perforation | 403.30 | 404.30 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6667 | 0.0 | 0.0 | 0.0 |
2012 | 8646 | 0.0 | 0.0 | 0.0 |
2013 | 8737 | 0.0 | 0.0 | 0.0 |
2014 | 8700 | 0.0 | 0.0 | 0.0 |
2015 | 8711 | 0.0 | 0.0 | 0.0 |
2016 | 8694 | 0.0 | 0.0 | 0.0 |
2017 | 8720 | 0.0 | 0.0 | 0.0 |
2018 | 8615 | 0.0 | 0.0 | 0.0 |
2019 | 8706 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]