X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364222009000

Well Details

Well ID: 0364222009000
Loading map...
Location: 00/09-20-036-22W4/0
Location Alias: 00/09-20-36-22 W4M
Location Alias 2: 00/09-20-036-22 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 22
Section: 20
County/Municipality: Red Deer County
Well Name: EMBER MIKWAN 9-20-36-22
Operator Name: Ember Resources Inc.
License Number: 0420335
License Date: 2010-05-11
License Status: Amended
Spud Date: 2010-11-28
Final Drill Date: 2010-12-04
Well Total Depth: 871.30 m
Surface Hole Latitude: 52.108972
Surface Hole Longitude: -113.102183

For data sources see[1][2]

Well History

Date Event
2010-05-11 Obtained License
2010-11-28 Surface Casing Operation Performed
2010-12-04 Finished Drilling
2010-12-04 Production Casing Operation Performed
2010-12-04 Rig Released
2010-12-04 Well Mode changed to Drilled and Cased
2010-12-06 Well Log Performed
2011-01-19 Perforation Treatment Performed - Jet Perforation
2011-02-27 Perforation Treatment Performed - Jet Perforation
2011-03-04 Perforation Treatment Performed - Fractured
2011-03-07 Well Fluid changed to Coalbed Methane-Coals and Other
2011-03-07 Well Mode changed to Testing
2011-03-11 Well Began Production
2011-03-11 Well Fluid changed to Coalbed Methane-Coals and Other
2011-03-11 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-19 Perforation 792.00 793.00 13
2011-02-27 Perforation 254.40 256.40 13
2011-02-27 Perforation 242.30 243.30 13
2011-02-27 Perforation 238.50 239.50 13
2011-02-27 Perforation 280.50 281.50 13
2011-02-27 Perforation 314.10 315.10 13
2011-02-27 Perforation 310.80 311.30 13
2011-02-27 Perforation 294.00 294.50 13
2011-02-27 Perforation 396.50 397.50 13
2011-02-27 Perforation 507.10 509.60 13
2011-02-27 Perforation 487.20 487.70 13
2011-02-27 Perforation 369.20 370.70 13
2011-02-27 Perforation 483.30 483.80 13
2011-02-27 Perforation 788.50 789.50 13
2011-02-27 Perforation 785.90 786.90 13
2011-02-27 Perforation 783.50 784.50 13
2011-02-27 Perforation 479.70 480.70 13
2011-02-27 Perforation 405.20 406.20 13
2011-02-27 Perforation 419.70 420.70 13
2011-02-27 Perforation 413.90 415.40 13
2011-02-27 Perforation 426.30 428.30 13
2011-02-27 Perforation 472.20 474.70 13
2011-02-27 Perforation 359.30 360.30 13
2011-02-27 Perforation 452.80 453.30 13
2011-03-04 Fracture 238.50 487.70 0
2011-03-04 Fracture 507.10 509.60 0
2011-03-04 Fracture 783.50 789.50 0
2011-02-27 Perforation 352.60 353.60 13
2011-02-27 Perforation 373.10 375.10 13
2011-02-27 Perforation 392.10 393.60 13
2011-02-27 Perforation 385.40 386.90 13
2011-02-27 Perforation 381.10 382.10 13
2011-02-27 Perforation 330.50 331.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7123 0.0 0.0 0.0
2012 8692 0.0 0.0 0.0
2013 8689 0.0 0.0 0.0
2014 8700 0.0 0.0 0.0
2015 8711 0.0 0.0 0.0
2016 8694 0.0 0.0 0.0
2017 8720 0.0 0.0 0.0
2018 8615 0.0 0.0 0.0
2019 8706 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References