If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364213316000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.14143,"lon":-112.939045,"icon":""}]} |
Location: 00/16-33-036-21W4/0 | |
Location Alias: 00/16-33-36-21 W4M | |
Location Alias 2: 00/16-33-036-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 21 | |
Section: 33 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: EMBER FENNW 16-33-36-21 | |
Operator Name: Ember Resources Inc. | |
License Number: 0410977 | |
License Date: 2009-06-16 | |
License Status: Issued | |
Spud Date: 2009-09-30 | |
Final Drill Date: 2009-10-29 | |
Well Total Depth: 815.00 m | |
Surface Hole Latitude: 52.141430 | |
Surface Hole Longitude: -112.939045 |
Date | Event |
---|---|
2009-06-16 | Obtained License |
2009-09-30 | Surface Casing Operation Performed |
2009-10-29 | Finished Drilling |
2009-10-29 | Well Mode changed to Drilled and Cased |
2009-10-30 | Production Casing Operation Performed |
2009-10-30 | Rig Released |
2009-11-04 | Well Log Performed |
2009-11-23 | Perforation Treatment Performed - Jet Perforation |
2009-11-26 | Perforation Treatment Performed - Fractured |
2010-01-21 | Well Began Production |
2010-01-21 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-01-21 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-11-23 | Perforation | 398.00 | 399.00 | 13 |
2009-11-23 | Perforation | 287.30 | 287.80 | 13 |
2009-11-23 | Perforation | 313.50 | 314.50 | 13 |
2009-11-23 | Perforation | 328.00 | 330.00 | 13 |
2009-11-23 | Perforation | 365.00 | 367.00 | 13 |
2009-11-23 | Perforation | 333.50 | 334.00 | 13 |
2009-11-23 | Perforation | 362.90 | 363.40 | 13 |
2009-11-23 | Perforation | 379.00 | 380.50 | 13 |
2009-11-23 | Perforation | 343.00 | 343.50 | 13 |
2009-11-23 | Perforation | 357.30 | 358.30 | 13 |
2009-11-23 | Perforation | 762.00 | 762.50 | 13 |
2009-11-23 | Perforation | 406.20 | 407.20 | 13 |
2009-11-23 | Perforation | 770.70 | 771.20 | 13 |
2009-11-23 | Perforation | 798.50 | 799.50 | 13 |
2009-11-23 | Perforation | 761.00 | 761.50 | 13 |
2009-11-23 | Perforation | 789.30 | 789.80 | 13 |
2009-11-23 | Perforation | 791.00 | 791.50 | 13 |
2009-11-23 | Perforation | 772.30 | 772.80 | 13 |
2009-11-23 | Perforation | 787.00 | 787.50 | 13 |
2009-11-23 | Perforation | 522.60 | 523.10 | 13 |
2009-11-23 | Perforation | 490.30 | 491.40 | 13 |
2009-11-23 | Perforation | 476.00 | 477.50 | 13 |
2009-11-23 | Perforation | 390.50 | 392.00 | 13 |
2009-11-23 | Perforation | 472.90 | 474.40 | 13 |
2009-11-23 | Perforation | 457.50 | 458.50 | 13 |
2009-11-23 | Perforation | 518.60 | 519.10 | 13 |
2009-11-23 | Perforation | 515.40 | 515.90 | 13 |
2009-11-23 | Perforation | 513.00 | 514.00 | 13 |
2009-11-26 | Fracture | 328.00 | 367.00 | 0 |
2009-11-26 | Fracture | 513.00 | 523.10 | 0 |
2009-11-26 | Fracture | 761.00 | 791.50 | 0 |
2009-11-26 | Fracture | 287.30 | 491.40 | 0 |
2009-11-23 | Perforation | 394.00 | 395.50 | 13 |
2009-11-23 | Perforation | 412.40 | 412.90 | 13 |
2009-11-23 | Perforation | 428.50 | 429.50 | 13 |
2009-11-23 | Perforation | 432.50 | 434.00 | 13 |
2009-11-23 | Perforation | 420.80 | 422.30 | 13 |
2009-11-23 | Perforation | 425.50 | 426.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 8241 | 0.0 | 0.0 | 0.0 |
2011 | 8637 | 0.0 | 0.0 | 0.0 |
2012 | 8709 | 0.0 | 0.0 | 0.0 |
2013 | 8702 | 0.0 | 0.0 | 0.0 |
2014 | 8714 | 0.0 | 0.0 | 0.0 |
2015 | 8534 | 0.0 | 0.0 | 0.0 |
2016 | 8546 | 0.0 | 0.0 | 0.0 |
2017 | 8698 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2181 | 0.0 | 0.0 | 0.0 |
For data sources see[5]