X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364203506022

Well Details

Well ID: 0364203506022
Loading map...
Location: 02/06-35-036-20W4/2
Location Alias: 02/06-35-36-20 W4M
Location Alias 2: 02/06-35-036-20 W4/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 35
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH 102 FENNBV 6-35-36-20
Operator Name: Cona Resources Ltd.
License Number: 0096027
License Date: 1982-05-26
License Status: Abandoned
Spud Date: 1982-06-15
Final Drill Date: 1982-06-30
Well Total Depth: 1685.00 m
Surface Hole Latitude: 52.132042
Surface Hole Longitude: -112.754437

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-05-26 Obtained License
1982-06-15 Direction Drilling Operation Performed - 98
1982-06-30 Finished Drilling
1982-06-30 Well Mode changed to Drilled and Cased
1982-07-03 Production Casing Operation Performed
1982-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-05 Perforation Treatment Performed - Jet Perforation
1984-05-09 Perforation Treatment Performed - Cement Squeeze
1984-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-10 Perforation Treatment Performed - Jet Perforation
1985-01-16 Perforation Treatment Performed - Cement Squeeze
1985-01-17 Perforation Treatment Performed - Jet Perforation
1985-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-11 Well Log Performed
1987-08-13 Perforation Treatment Performed - Cement Squeeze
1987-08-14 Well Log Performed
1987-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-15 Perforation Treatment Performed - Jet Perforation
1987-09-04 Well Log Performed
1988-04-26 Well Log Performed
1988-04-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-04-27 Plug Back Performed
1988-04-27 Well Log Performed
1988-04-28 Perforation Treatment Performed - Jet Perforation
1988-05-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-05-03 Perforation Treatment Performed - Jet Perforation
1988-05-03 Plug Back Performed
1988-05-05 Well Log Performed
1988-06-25 Perforation Treatment Performed - Fractured
1988-07-01 Well Began Production
1988-07-01 Well Fluid changed to Gas
1988-07-01 Well Mode changed to Pumping
2001-03-08 Perforation Treatment Performed - Jet Perforation
2001-03-08 Well Log Performed
2003-10-04 Perforation Treatment Performed - Jet Perforation
2003-10-04 Well Log Performed
2003-10-07 Perforation Treatment Performed - Fractured
2010-06-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-26 Plug Back Performed
2010-06-26 Well Fluid changed to Gas
2010-06-26 Well Log Performed
2010-06-26 Well Mode changed to Abandoned Zone
2010-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-05 Plug Back Performed
2010-10-05 Well Log Performed
2010-10-06 Well Log Performed
2013-01-19 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1982-06-15 1204.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-08-05 Perforation 1604.00 1606.00 13
1987-08-15 Perforation 1605.00 1609.00 13
1987-08-15 Acid Treatment 1605.00 1609.00 0
1988-04-27 Packing Device Capped w/Cement 1582.00 1590.00 0
1988-04-28 Perforation 1302.00 1304.00 13
1988-05-03 Packing Device Capped w/Cement 1289.00 1298.00 0
1988-05-03 Perforation 665.00 666.00 13
1988-05-03 Perforation 629.00 630.00 13
1988-06-25 Fracture 665.00 666.00 0
2001-03-08 Perforation 365.00 367.50 13
2003-10-04 Perforation 300.00 305.00 17
1982-08-05 Acid Treatment 1604.00 1606.00 0
2003-10-07 Fracture 300.00 305.00 0
2010-06-26 Packing Device Capped w/Cement 627.00 635.00 0
2010-06-26 Packing Device Capped w/Cement 349.00 357.00 0
2010-10-05 Packing Device Capped w/Cement 288.80 296.80 0
1984-05-09 Cement Squeeze 1604.00 1606.00 0
1984-05-10 Perforation 1600.00 1602.00 13
1984-05-10 Acid Treatment 1600.00 1602.00 0
1985-01-16 Cement Squeeze 1600.00 1602.00 0
1985-01-17 Perforation 1594.50 1601.00 13
1985-01-18 Acid Treatment 1594.50 1601.00 0
1987-08-13 Cement Squeeze 1594.50 1601.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 800 0.0 0.0 0.0
1989 7561 0.0 0.0 0.0
1990 8377 0.0 0.0 0.0
1991 7962 0.0 0.0 0.0
1992 8704 0.0 0.0 0.0
1993 7915 0.0 0.0 0.0
1994 8261 0.0 0.0 0.0
1995 8251 0.0 0.0 0.0
1996 7610 0.0 0.0 0.0
1997 4775 0.0 0.0 0.0
1998 8580 0.0 0.0 0.0
1999 8455 0.0 0.0 0.0
2000 8749 0.0 0.0 0.0
2001 2278 0.0 0.0 0.0
2002 7555 0.0 0.0 0.0
2003 8500 0.0 0.0 0.0
2004 8732 0.0 0.0 0.0
2005 7977 0.0 0.0 0.0
2006 5948 0.0 0.0 0.0
2007 5029 0.0 0.0 0.0
2008 8745 0.0 0.0 0.0
2009 7037 0.0 0.0 0.0
2010 1176 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-10-05 No Incident Encountered 0.00 0.00

For data sources see[7]

References