X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364203503000

Well Details

Well ID: 0364203503000
Loading map...
Location: 00/03-35-036-20W4/0
Location Alias: 00/03-35-36-20 W4M
Location Alias 2: 00/03-35-036-20 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 35
County/Municipality: County of Stettler No. 6
Well Name: CPR ROBERT NO.3
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0006081
License Date: 1953-02-19
License Status: RecCertified
Spud Date: 1953-04-26
Final Drill Date: 1953-05-20
Well Total Depth: 1622.10 m
Surface Hole Latitude: 52.130206
Surface Hole Longitude: -112.757950

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-02-19 Obtained License
1953-05-20 Finished Drilling
1953-05-20 Well Mode changed to Drilled and Cased
1953-05-23 Production Casing Operation Performed
1953-05-25 Perforation Treatment Performed - Open-Hole Completion
1953-06-21 Well Began Production
1953-06-21 Well Fluid changed to Crude Oil
1953-06-21 Well Mode changed to Flowing
1980-03-11 Perforation Treatment Performed - Cement Plug
1980-03-11 Perforation Treatment Performed - Open-Hole Completion
1980-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-21 Perforation Treatment Performed - Cement Squeeze
1984-02-22 Perforation Treatment Performed - Jet Perforation
1984-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-08 Perforation Treatment Performed - Cement Squeeze
1986-01-09 Perforation Treatment Performed - Jet Perforation
1986-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-11 Perforation Treatment Performed - Cement Squeeze
1986-07-14 Well Fluid changed to Crude Oil
1986-07-14 Well Mode changed to Pumping
1986-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-15 Perforation Treatment Performed - Jet Perforation
1987-01-07 Well Log Performed
1987-09-22 Well Log Performed
1987-09-24 Perforation Treatment Performed - Cement Squeeze
1987-09-28 Well Log Performed
1987-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-09-29 Perforation Treatment Performed - Jet Perforation
1988-03-11 Perforation Treatment Performed - Cement Squeeze
1988-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-16 Perforation Treatment Performed - Jet Perforation
1992-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-11-24 Plug Back Performed
1992-11-24 Well Fluid changed to Crude Oil
1992-11-24 Well Mode changed to Abandoned Zone
1996-02-22 Perforation Treatment Performed - Jet Perforation
1996-02-23 Perforation Treatment Performed - Cement Plug
1996-02-23 Perforation Treatment Performed - Remedial Casing
1996-05-16 Well Abandoned
1996-05-16 Well Fluid changed to Crude Oil
1996-05-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-05-25 Open Hole/Barefoot Completion 1598.10 1622.10 0
1986-01-10 Acid Treatment 1592.50 1594.00 0
1986-07-11 Cement Squeeze 1592.00 1594.00 0
1986-07-15 Perforation 1593.00 1597.00 13
1986-07-15 Acid Treatment 1593.00 1597.00 0
1987-09-24 Cement Squeeze 1593.00 1597.00 0
1987-09-29 Perforation 1590.90 1592.90 13
1987-09-29 Acid Treatment 1590.90 1592.90 0
1988-03-11 Cement Squeeze 1590.90 1592.00 0
1988-03-16 Perforation 1589.00 1591.50 13
1988-03-16 Acid Treatment 1589.00 1591.50 0
1980-03-11 Cement Plug 1607.80 1622.10 0
1992-11-24 Packing Device Capped w/Cement 1579.20 1588.20 0
1996-02-22 Perforation 309.00 310.00 13
1996-02-23 Remedial Casing Cementing 309.00 310.00 0
1996-02-23 Cement Plug 290.00 310.00 0
1980-03-11 Open Hole/Barefoot Completion 1598.10 1607.80 0
1980-12-17 Acid Treatment 1598.10 1607.80 0
1984-02-21 Cement Squeeze 1598.10 1607.80 0
1984-02-22 Perforation 1596.50 1600.80 13
1984-02-23 Acid Treatment 1596.50 1600.80 0
1986-01-08 Cement Squeeze 1596.50 1600.80 0
1986-01-09 Perforation 1592.50 1594.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5736 0.0 0.0 0.0
1968 5435 0.0 0.0 0.0
1969 6291 0.0 0.0 0.0
1970 4002 0.0 0.0 0.0
1971 3901 0.0 0.0 0.0
1972 5574 0.0 0.0 0.0
1973 6830 0.0 0.0 0.0
1974 6522 0.0 0.0 0.0
1975 6324 0.0 0.0 0.0
1976 4920 0.0 0.0 0.0
1977 5256 0.0 0.0 0.0
1978 4584 0.0 0.0 0.0
1979 5439 0.0 0.0 0.0
1980 6414 0.0 0.0 0.0
1981 5917 0.0 0.0 0.0
1982 5617 0.0 0.0 0.0
1983 5599 0.0 0.0 0.0
1984 8119 0.0 0.0 0.0
1985 5335 0.0 0.0 0.0
1986 6656 0.0 0.0 0.0
1987 7773 0.0 0.0 0.0
1988 8522 0.0 0.0 0.0
1989 8461 0.0 0.0 0.0
1990 8678 0.0 0.0 0.0
1991 8291 0.0 0.0 0.0
1992 5919 0.0 0.0 0.0

For data sources see[5]

References