X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364203207000

Well Details

Well ID: 0364203207000
Loading map...
Location: 00/07-32-036-20W4/0
Location Alias: 00/07-32-36-20 W4M
Location Alias 2: 00/07-32-036-20 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 32
County/Municipality: County of Stettler No. 6
Well Name: BEARSPAW EWINGLK 7-32-36-20
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0136215
License Date: 1988-09-07
License Status: Issued
Spud Date: 1988-09-13
Final Drill Date: 1988-09-24
Well Total Depth: 1653.00 m
Surface Hole Latitude: 52.134375
Surface Hole Longitude: -112.824407

For data sources see[1][2]

Well History

Date Event
1988-09-07 Obtained License
1988-09-14 Lost Circulation Occurred
1988-09-15 Surface Casing Operation Performed
1988-09-24 Finished Drilling
1988-09-24 Lost Circulation Occurred
1988-09-24 Well Mode changed to Drilled and Cased
1988-09-27 Kick Occurred
1988-09-29 Well Log Performed
1988-09-30 Kick Occurred
1988-10-02 Production Casing Operation Performed
1988-10-03 Rig Released
1988-10-23 Well Log Performed
1988-10-24 Perforation Treatment Performed - Jet Perforation
1988-10-24 Well Log Performed
1988-10-25 Perforation Treatment Performed - Remedial Casing
1988-10-26 Perforation Treatment Performed - Jet Perforation
1988-10-26 Perforation Treatment Performed - Remedial Casing
1988-10-26 Well Log Performed
1988-10-27 Perforation Treatment Performed - Jet Perforation
1988-10-27 Perforation Treatment Performed - Remedial Casing
1988-10-27 Well Log Performed
1988-11-02 Well Log Performed
1988-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-11-03 Perforation Treatment Performed - Jet Perforation
1988-11-03 Well Log Performed
1988-11-04 Well Began Production
1988-11-04 Well Fluid changed to Crude Oil
1988-11-04 Well Mode changed to Pumping
1988-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-11-19 Well Log Performed
1990-04-22 Well Log Performed
1990-04-24 Perforation Treatment Performed - Cement Squeeze
1990-04-28 Perforation Treatment Performed - Abrasa-Jet Perforation
1990-04-28 Well Log Performed
1990-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-27 Perforation Treatment Performed - Cement Squeeze
1991-03-03 Perforation Treatment Performed - Jet Perforation
1991-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-07 Well Began Injection
1991-03-07 Well Fluid changed to Water
1991-03-07 Well Type changed to Injection
2012-02-01 Well Fluid changed to Water
2012-02-01 Well Type changed to Disposal
2016-03-09 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-10-24 Perforation 1640.00 1641.00 13
1990-04-24 Cement Squeeze 1636.00 1636.80 0
1990-04-28 Hydra Jet Perforation 1636.00 1636.50 0
1990-04-30 Acid Treatment 1636.00 1636.50 0
1991-02-27 Cement Squeeze 1636.00 1636.50 0
1991-03-03 Perforation 1640.00 1643.00 13
1991-03-04 Acid Treatment 1640.00 1643.00 0
2016-03-09 Chemical Squeeze 1640.00 1643.00 0
1988-10-25 Remedial Casing Cementing 1640.00 1641.00 0
1988-10-26 Perforation 1439.00 1440.00 13
1988-10-26 Remedial Casing Cementing 1439.00 1440.00 0
1988-10-27 Perforation 1235.00 1236.00 13
1988-10-27 Remedial Casing Cementing 1235.00 1236.00 0
1988-11-03 Perforation 1636.00 1636.80 13
1988-11-03 Acid Treatment 1636.00 1636.80 0
1988-11-06 Acid Treatment 1636.00 1636.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 659 0.0 0.0 0.0
1989 7487 0.0 0.0 0.0
1990 431 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-09-14 Lost Circulation 132.00 155.00
1988-09-24 Lost Circulation 1653.00 1653.00
1988-09-27 Kick 1653.00 1653.00
1988-09-30 Kick 1653.00 1653.00
2016-03-09 No Incident Encountered 0.00 0.00

For data sources see[6]

References