X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364203114002

Well Details

Well ID: 0364203114002
Loading map...
Location: 00/14-31-036-20W4/2
Location Alias: 00/14-31-36-20 W4M
Location Alias 2: 00/14-31-036-20 W4/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 31
County/Municipality: County of Stettler No. 6
Well Name: AMOCO EWINGLK 14-31-36-20
Operator Name: BP Canada Energy Group ULC
License Number: 0021766
License Date: 1961-12-04
License Status: RecCertified
Spud Date: 1961-12-05
Final Drill Date: 1961-12-22
Well Total Depth: 1692.60 m
Surface Hole Latitude: 52.140876
Surface Hole Longitude: -112.852849

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-12-04 Obtained License
1961-12-22 Finished Drilling
1961-12-22 Lost Circulation Occurred
1961-12-23 Drill Stem Test Performed
1961-12-25 Production Casing Operation Performed
1961-12-27 Perforation Treatment Performed - Jet Perforation
1961-12-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-06-14 Perforation Treatment Performed - Cement Squeeze
1966-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-06-17 Perforation Treatment Performed - Jet Perforation
1976-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-09-22 Perforation Treatment Performed - Cement Squeeze
1976-09-23 Perforation Treatment Performed - Jet Perforation
1976-11-02 Perforation Treatment Performed - Alcohol Squeeze
1978-01-01 Well Mode changed to Drilled and Cased
1981-01-20 Well Log Performed
1991-11-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-11-29 Plug Back Performed
1991-11-29 Well Mode changed to Abandoned
1991-11-30 Perforation Treatment Performed - Jet Perforation
1991-11-30 Perforation Treatment Performed - Remedial Casing
1992-04-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-12-27 Perforation 1639.80 1642.30 13
1991-11-29 Packing Device Capped w/Cement 1330.00 1340.00 0
1991-11-30 Perforation 234.80 235.30 7
1991-11-30 Remedial Casing Cementing 234.80 235.30 0
1961-12-28 Acid Treatment 1639.80 1642.30 0
1966-06-14 Cement Squeeze 1639.80 1642.30 0
1966-06-17 Perforation 1641.00 1641.70 13
1966-06-17 Acid Treatment 1641.00 1641.70 0
1976-09-22 Cement Squeeze 1641.00 1641.70 0
1976-09-22 Packing Device Capped w/Cement 1595.90 1633.70 0
1976-09-23 Perforation 1343.30 1347.80 13
1976-11-02 Alchohol Squeeze 1343.30 1347.80 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1961-12-22 Lost Circulation 1315.50 1344.80

For data sources see[5]

References