X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364203005020

Well Details

Well ID: 0364203005020
Loading map...
Location: 02/05-30-036-20W4/0
Location Alias: 02/05-30-36-20 W4M
Location Alias 2: 02/05-30-036-20 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 30
County/Municipality: County of Stettler No. 6
Well Name: BEARSPAW 102 FENNW 5-30-36-20
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0437010
License Date: 2011-09-21
License Status: Amended
Spud Date: 2012-01-22
Final Drill Date: 2012-01-24
Well Total Depth: 871.00 m
Surface Hole Latitude: 52.121543
Surface Hole Longitude: -112.859676

For data sources see[1][2]

Well History

Date Event
2011-09-21 Obtained License
2012-01-22 Direction Drilling Operation Performed - Deviate
2012-01-23 Surface Casing Operation Performed
2012-01-24 Finished Drilling
2012-01-24 Well Mode changed to Drilled and Cased
2012-01-25 Production Casing Operation Performed
2012-01-25 Rig Released
2012-01-31 Well Log Performed
2012-05-17 Perforation Treatment Performed - Jet Perforation
2015-02-01 Well Began Production
2015-02-01 Well Fluid changed to Coalbed Methane-Coals Only
2015-02-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-22 Bearspaw Petroleum Ltd. 2 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-22 20.00 Deviate (5 - 79 degrees)

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-05-17 Perforation 832.20 833.10 13
2012-05-17 Perforation 397.00 401.00 13
2012-05-17 Perforation 395.00 396.00 13
2012-05-17 Perforation 386.20 387.20 13
2012-05-17 Perforation 380.70 383.20 13
2012-05-17 Perforation 378.20 379.70 13
2012-05-17 Perforation 361.20 363.20 13
2012-05-17 Perforation 357.50 358.50 13
2012-05-17 Perforation 354.10 356.10 13
2012-05-17 Perforation 343.50 345.50 13
2012-05-17 Perforation 340.50 342.00 13
2012-05-17 Perforation 828.00 831.00 13
2012-05-17 Perforation 337.50 339.50 13
2012-05-17 Perforation 288.30 289.80 13
2012-05-17 Perforation 286.20 287.20 13
2012-05-17 Perforation 282.20 284.00 13
2012-05-17 Perforation 267.30 270.30 13
2012-05-17 Perforation 260.70 262.20 13
2012-05-17 Perforation 253.80 254.80 13
2012-05-17 Perforation 249.20 250.20 13
2012-05-17 Perforation 245.40 246.40 13
2012-05-17 Perforation 234.00 235.50 13
2012-05-17 Perforation 533.20 535.20 13
2012-05-17 Perforation 221.20 222.20 13
2012-05-17 Perforation 203.70 204.20 13
2012-05-17 Perforation 523.20 525.20 13
2012-05-17 Perforation 469.00 471.00 13
2012-05-17 Perforation 463.50 465.00 13
2012-05-17 Perforation 449.20 450.20 13
2012-05-17 Perforation 415.00 417.00 13
2012-05-17 Perforation 405.20 406.20 13

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 7167 0.0 0.0 0.0
2016 8423 0.0 0.0 0.0
2017 6497 0.0 0.0 0.0
2018 5152 0.0 0.0 0.0
2019 4631 0.0 0.0 0.0
2020 2015 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-17 No Incident Encountered 0.00 0.00

For data sources see[8]

References