X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364202307000

Well Details

Well ID: 0364202307000
Loading map...
Location: 00/07-23-036-20W4/0
Location Alias: 00/07-23-36-20 W4M
Location Alias 2: 00/07-23-036-20 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 23
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH FENNBV 7-23-36-20
Operator Name: Enhance Energy Inc.
License Number: 0004230
License Date: 1952-02-16
License Status: Issued
Spud Date: 1952-02-21
Final Drill Date: 1952-03-16
Well Total Depth: 1617.90 m
Surface Hole Latitude: 52.104686
Surface Hole Longitude: -112.752059

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-02-16 Obtained License
1952-03-16 Finished Drilling
1952-03-16 Well Mode changed to Drilled and Cased
1952-03-17 Production Casing Operation Performed
1952-03-20 Drill Stem Test Performed
1952-03-20 Perforation Treatment Performed - Open-Hole Completion
1952-04-08 Well Began Production
1952-04-08 Well Fluid changed to Crude Oil
1952-04-08 Well Mode changed to Flowing
1953-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1953-03-01 Well Fluid changed to Crude Oil
1953-03-01 Well Mode changed to Abandoned Zone
1953-03-02 Perforation Treatment Performed - Jet Perforation
1953-04-25 Perforation Treatment Performed - Acid Wash - No Pressure
1978-09-12 Perforation Treatment Performed - Cement Squeeze
1978-09-13 Perforation Treatment Performed - Cement Squeeze
1978-09-22 Perforation Treatment Performed - Open-Hole Completion
1978-09-25 Well Fluid changed to Crude Oil
1978-09-25 Well Mode changed to Flowing
1978-10-13 Perforation Treatment Performed - Jet Perforation
1978-10-17 Perforation Treatment Performed - Acid Wash - No Pressure
1984-12-01 Well Fluid changed to Crude Oil
1984-12-01 Well Mode changed to Suspended
1985-05-17 Perforation Treatment Performed - Cement Squeeze
1985-05-21 Well Log Performed
1985-05-22 Perforation Treatment Performed - Acid Wash - No Pressure
1985-05-22 Perforation Treatment Performed - Jet Perforation
1986-07-24 Perforation Treatment Performed - Cement Squeeze
1986-07-25 Well Log Performed
1986-07-26 Perforation Treatment Performed - Jet Perforation
1987-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-18 Well Fluid changed to Crude Oil
1988-02-18 Well Mode changed to Pumping
1995-10-07 Well Log Performed
1995-10-08 Perforation Treatment Performed - Jet Perforation
1995-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-06-12 Well Log Performed
1997-06-14 Perforation Treatment Performed - Jet Perforation
1997-06-14 Well Log Performed
1997-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-12-18 Well Fluid changed to Crude Oil
2009-12-18 Well Mode changed to Pumping
2010-05-31 Well Log Performed
2010-06-03 Well Log Performed
2010-06-05 Perforation Treatment Performed - Jet Perforation
2010-06-05 Well Log Performed
2010-06-06 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-03-20 Open Hole/Barefoot Completion 1616.40 1617.90 0
1985-05-17 Cement Squeeze 1575.50 1579.80 0
1985-05-22 Perforation 1569.70 1572.70 13
1985-05-22 Acid Wash 1569.70 1572.70 0
1986-07-24 Cement Squeeze 1569.70 1572.70 0
1986-07-26 Perforation 1569.70 1571.20 13
1987-09-03 Acid Treatment 1569.70 1571.20 0
1988-02-04 Acid Treatment 1569.70 1571.20 0
1995-10-08 Perforation 1614.80 1616.40 13
1995-10-09 Acid Treatment 1614.80 1616.40 0
1997-06-14 Perforation 1566.00 1570.00 18
1953-03-01 Packing Device Capped w/Cement 1603.20 1603.20 0
1997-06-15 Acid Treatment 1566.00 1570.00 0
1997-06-17 Acid Treatment 1569.70 1617.90 0
2010-06-05 Perforation 215.00 216.00 13
2010-06-06 Cement Squeeze 215.00 216.00 0
1953-03-02 Perforation 1591.10 1594.10 13
1953-04-25 Acid Wash 1591.10 1594.10 0
1978-09-12 Cement Squeeze 1591.10 1594.10 0
1978-09-13 Cement Squeeze 1591.10 1594.10 0
1978-09-22 Open Hole/Barefoot Completion 1616.40 1617.90 0
1978-10-13 Perforation 1575.50 1579.80 13
1978-10-17 Acid Wash 1575.50 1579.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1978 416 0.0 0.0 0.0
1979 1920 0.0 0.0 0.0
1980 1711 0.0 0.0 0.0
1981 1330 0.0 0.0 0.0
1982 1832 0.0 0.0 0.0
1983 2445 0.0 0.0 0.0
1984 2181 0.0 0.0 0.0
1988 7675 0.0 0.0 0.0
1989 8478 0.0 0.0 0.0
1990 8364 0.0 0.0 0.0
1991 8325 0.0 0.0 0.0
1992 8648 0.0 0.0 0.0
1993 7670 0.0 0.0 0.0
1994 8694 0.0 0.0 0.0
1995 8182 0.0 0.0 0.0
1996 8685 0.0 0.0 0.0
1997 7547 0.0 0.0 0.0
1998 8630 0.0 0.0 0.0
1999 8053 0.0 0.0 0.0
2000 8743 0.0 0.0 0.0
2001 8519 0.0 0.0 0.0
2002 8641 0.0 0.0 0.0
2003 8389 0.0 0.0 0.0
2004 6774 0.0 0.0 0.0
2006 106 0.0 0.0 0.0
2007 5880 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8477 0.0 0.0 0.0
2011 8701 0.0 0.0 0.0
2012 7868 0.0 0.0 0.0
2013 5397 0.0 0.0 0.0
2014 8679 0.0 0.0 0.0
2015 8539 0.0 0.0 0.0
2016 3788 0.0 0.0 0.0
2017 8657 0.0 0.0 0.0
2018 8750 0.0 0.0 0.0
2019 8750 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References