X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364201707000

Well Details

Well ID: 0364201707000
Loading map...
Location: 00/07-17-036-20W4/0
Location Alias: 00/07-17-36-20 W4M
Location Alias 2: 00/07-17-036-20 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 17
County/Municipality: County of Stettler No. 6
Well Name: NORCEN FENN WEST 7-17-36-20
Operator Name: Canadian Natural Resources Limited
License Number: 0022744
License Date: 1962-07-19
License Status: Abandoned
Spud Date: 1962-07-21
Final Drill Date: 1962-07-31
Well Total Depth: 1698.00 m
Surface Hole Latitude: 52.090247
Surface Hole Longitude: -112.823516

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-07-19 Obtained License
1962-07-31 Finished Drilling
1962-07-31 Well Mode changed to Drilled and Cased
1962-08-01 Drill Stem Test Performed
1962-08-02 Production Casing Operation Performed
1962-08-08 Perforation Treatment Performed - Jet Perforation
1962-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-08-09 Well Began Production
1962-08-09 Well Fluid changed to Crude Oil
1962-08-09 Well Mode changed to Flowing
1966-10-13 Well Fluid changed to Crude Oil
1966-10-13 Well Mode changed to Pumping
1985-01-01 Well Fluid changed to Crude Oil
1985-01-01 Well Mode changed to Suspended
1988-04-19 Well Log Performed
1990-09-13 Well Log Performed
1990-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-14 Perforation Treatment Performed - Jet Perforation
1990-09-14 Plug Back Performed
1990-09-14 Well Fluid changed to Crude Oil
1990-09-14 Well Log Performed
1990-09-14 Well Mode changed to Abandoned
1990-09-17 Perforation Treatment Performed - Remedial Casing
1990-10-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-08-08 Perforation 1684.30 1685.80 13
1962-08-09 Acid Treatment 1684.30 1685.80 0
1990-09-14 Packing Device Capped w/Cement 1664.00 1672.00 0
1990-09-14 Perforation 287.00 288.00 8
1990-09-17 Remedial Casing Cementing 287.00 288.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 344 0.0 0.0 0.0
1968 3413 0.0 0.0 0.0
1969 2818 0.0 0.0 0.0
1970 2061 0.0 0.0 0.0
1971 2188 0.0 0.0 0.0
1972 3110 0.0 0.0 0.0
1973 7024 0.0 0.0 0.0
1974 8153 0.0 0.0 0.0
1975 6688 0.0 0.0 0.0
1976 7839 0.0 0.0 0.0
1977 7843 0.0 0.0 0.0
1978 7126 0.0 0.0 0.0
1979 8616 0.0 0.0 0.0
1980 7344 0.0 0.0 0.0
1981 8585 0.0 0.0 0.0
1982 4680 0.0 0.0 0.0
1983 8466 0.0 0.0 0.0
1984 7964 0.0 0.0 0.0

For data sources see[5]

References