X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364201108000

Well Details

Well ID: 0364201108000
Loading map...
Location: 00/08-11-036-20W4/0
Location Alias: 00/08-11-36-20 W4M
Location Alias 2: 00/08-11-036-20 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 11
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH FENNBV 8-11-36-20
Operator Name: Enhance Energy Inc.
License Number: 0007012
License Date: 1953-09-03
License Status: Issued
Spud Date: 1953-09-11
Final Drill Date: 1953-10-14
Well Total Depth: 1661.80 m
Surface Hole Latitude: 52.075566
Surface Hole Longitude: -112.746164

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-09-03 Obtained License
1953-10-14 Finished Drilling
1953-10-14 Well Mode changed to Drilled and Cased
1953-10-16 Production Casing Operation Performed
1953-10-18 Perforation Treatment Performed - Bullet Perforation
1953-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1953-10-19 Perforation Treatment Performed - Bullet Perforation
1953-10-19 Well Began Production
1953-10-19 Well Fluid changed to Crude Oil
1953-10-19 Well Mode changed to Flowing
1982-12-11 Perforation Treatment Performed - Cement Squeeze
1982-12-14 Perforation Treatment Performed - Jet Perforation
1984-12-20 Well Fluid changed to Crude Oil
1984-12-20 Well Mode changed to Pumping
1986-01-27 Well Log Performed
1986-01-29 Perforation Treatment Performed - Cement Squeeze
1986-01-30 Perforation Treatment Performed - Jet Perforation
1986-01-31 Perforation Treatment Performed - Jet Perforation
1986-02-04 Perforation Treatment Performed - Acid Wash - No Pressure
1986-02-05 Perforation Treatment Performed - Cement Squeeze
1986-02-07 Perforation Treatment Performed - Jet Perforation
1986-02-11 Perforation Treatment Performed - Acid Wash - No Pressure
1987-06-08 Perforation Treatment Performed - Selective Jet Perforations
1987-06-09 Perforation Treatment Performed - Acid Wash - No Pressure
1987-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-06-11 Perforation Treatment Performed - Acid Wash - No Pressure
1987-06-11 Perforation Treatment Performed - Jet Perforation
1987-06-12 Perforation Treatment Performed - Acid Wash - No Pressure
1987-06-15 Perforation Treatment Performed - Selective Jet Perforations
1987-06-16 Perforation Treatment Performed - Acid Wash - No Pressure
1987-06-16 Perforation Treatment Performed - Selective Jet Perforations
1987-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-06-18 Perforation Treatment Performed - Acid Wash - No Pressure
1987-06-18 Perforation Treatment Performed - Selective Jet Perforations
1988-07-28 Perforation Treatment Performed - Jet Perforation
1988-08-02 Perforation Treatment Performed - Jet Perforation
1991-02-12 Perforation Treatment Performed - Jet Perforation
1991-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-08-18 Well Log Performed
1995-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-08-20 Perforation Treatment Performed - Jet Perforation
1997-03-23 Perforation Treatment Performed - Cement Squeeze
1997-03-26 Perforation Treatment Performed - Cement Squeeze
1997-03-26 Perforation Treatment Performed - Jet Perforation
1997-03-26 Well Log Performed
1997-04-03 Perforation Treatment Performed - Jet Perforation
1997-04-03 Well Log Performed
1997-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-12 Perforation Treatment Performed - Jet Perforation
1997-12-12 Well Log Performed
1997-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-16 Perforation Treatment Performed - Jet Perforation
1997-12-16 Well Log Performed
1997-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-08-19 Perforation Treatment Performed - Jet Perforation
2008-10-09 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-10-18 Bullet Perforation 1642.90 1643.20 13
1986-02-04 Acid Wash 1605.00 1606.60 0
1986-02-05 Cement Squeeze 1605.00 1606.60 0
1986-02-07 Perforation 1608.00 1609.00 14
1986-02-11 Acid Wash 1608.00 1609.00 0
1987-06-08 Selective Jet Perforations 1606.20 1606.20 0
1987-06-09 Acid Wash 1606.20 1606.20 0
1987-06-10 Acid Treatment 1606.20 1606.20 0
1987-06-11 Acid Wash 1606.20 1606.20 0
1987-06-11 Perforation 1606.00 1606.20 15
1987-06-12 Acid Wash 1606.00 1606.20 0
1953-10-19 Bullet Perforation 1617.90 1624.00 13
1987-06-15 Selective Jet Perforations 1619.10 1619.10 0
1987-06-16 Selective Jet Perforations 1607.10 1607.10 0
1987-06-16 Acid Wash 1606.20 1619.10 0
1987-06-17 Acid Treatment 1606.20 1619.10 0
1987-06-18 Selective Jet Perforations 1595.00 1595.00 0
1987-06-18 Acid Wash 1595.00 1595.00 0
1988-07-28 Perforation 1605.00 1605.20 13
1988-08-02 Perforation 1603.30 1603.50 13
1991-02-12 Perforation 1601.50 1602.00 7
1991-02-14 Acid Treatment 1601.50 1602.00 0
1953-10-19 Packing Device Capped w/Cement 1638.30 1638.30 0
1995-08-20 Perforation 1598.50 1598.50 7
1995-08-20 Acid Treatment 1601.50 1602.00 0
1997-03-23 Cement Squeeze 1601.50 1619.10 0
1997-03-23 Cement Squeeze 1598.50 1598.50 0
1997-03-26 Perforation 1597.00 1597.50 18
1997-03-26 Cement Squeeze 1595.00 1598.50 0
1997-04-03 Perforation 1597.70 1598.20 13
1997-04-07 Acid Treatment 1597.70 1598.20 0
1997-12-12 Perforation 1590.50 1592.50 20
1997-12-12 Perforation 1596.50 1597.50 20
1953-10-19 Acid Treatment 1617.90 1624.00 0
1997-12-13 Acid Treatment 1590.50 1597.50 0
1997-12-16 Perforation 1594.50 1595.00 20
1997-12-17 Acid Treatment 1594.50 1595.00 0
1998-08-19 Perforation 1596.50 1597.50 20
1982-12-11 Cement Squeeze 1617.90 1624.00 0
1982-12-14 Perforation 1611.50 1614.20 13
1986-01-29 Cement Squeeze 1611.50 1614.20 0
1986-01-30 Perforation 1606.50 1606.60 13
1986-01-31 Perforation 1605.00 1605.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 336 0.0 0.0 0.0
1968 312 0.0 0.0 0.0
1969 3300 0.0 0.0 0.0
1970 4317 0.0 0.0 0.0
1971 3608 0.0 0.0 0.0
1972 5098 0.0 0.0 0.0
1973 5402 0.0 0.0 0.0
1974 6068 0.0 0.0 0.0
1975 5188 0.0 0.0 0.0
1976 4819 0.0 0.0 0.0
1977 3795 0.0 0.0 0.0
1978 5678 0.0 0.0 0.0
1979 6638 0.0 0.0 0.0
1980 5455 0.0 0.0 0.0
1981 6889 0.0 0.0 0.0
1982 5465 0.0 0.0 0.0
1983 6184 0.0 0.0 0.0
1984 6548 0.0 0.0 0.0
1985 7394 0.0 0.0 0.0
1986 6545 0.0 0.0 0.0
1987 7839 0.0 0.0 0.0
1988 7028 0.0 0.0 0.0
1989 7435 0.0 0.0 0.0
1990 3704 0.0 0.0 0.0
1991 6759 0.0 0.0 0.0
1992 8497 0.0 0.0 0.0
1993 8023 0.0 0.0 0.0
1994 8461 0.0 0.0 0.0
1995 8421 0.0 0.0 0.0
1996 8183 0.0 0.0 0.0
1997 7377 0.0 0.0 0.0
1998 8751 0.0 0.0 0.0
1999 8442 0.0 0.0 0.0
2000 8569 0.0 0.0 0.0
2001 7991 0.0 0.0 0.0
2002 8669 0.0 0.0 0.0
2003 8170 0.0 0.0 0.0
2004 8479 0.0 0.0 0.0
2005 8455 0.0 0.0 0.0
2006 8637 0.0 0.0 0.0
2007 8755 0.0 0.0 0.0
2008 7384 0.0 0.0 0.0
2009 8709 0.0 0.0 0.0
2010 8658 0.0 0.0 0.0
2011 8704 0.0 0.0 0.0
2012 7739 0.0 0.0 0.0
2013 5358 0.0 0.0 0.0
2014 8562 0.0 0.0 0.0
2015 8754 0.0 0.0 0.0
2016 8363 0.0 0.0 0.0
2017 8443 0.0 0.0 0.0
2018 8753 0.0 0.0 0.0
2019 6662 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References