X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364183601003

Well Details

Well ID: 0364183601003
Loading map...
Location: 00/01-36-036-18W4/3
Location Alias: 00/01-36-36-18 W4M
Location Alias 2: 00/01-36-036-18 W4/03
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 18
Section: 36
County/Municipality: County of Stettler No. 6
Well Name: TEAC LEO 1-36-36-18
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0232718
License Date: 2000-01-27
License Status: Issued
Spud Date: 2000-02-23
Final Drill Date: 2000-02-24
Well Total Depth: 585.00 m
Surface Hole Latitude: 52.131207
Surface Hole Longitude: -112.438245

For data sources see[1][2]

Well History

Date Event
2000-01-27 Obtained License
2000-02-24 Finished Drilling
2000-02-24 Surface Casing Operation Performed
2000-02-24 Well Mode changed to Drilled and Cased
2000-02-25 Well Log Performed
2000-02-26 Production Casing Operation Performed
2000-02-26 Rig Released
2000-03-05 Perforation Treatment Performed - Jet Perforation
2000-03-05 Well Log Performed
2000-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-03-06 Perforation Treatment Performed - Jet Perforation
2000-03-06 Plug Back Performed
2000-03-06 Well Log Performed
2002-03-15 Perforation Treatment Performed - Jet Perforation
2002-05-28 Perforation Treatment Performed - Fractured
2002-05-29 Perforation Treatment Performed - Fractured
2006-03-08 Perforation Treatment Performed - Jet Perforation
2006-03-09 Perforation Treatment Performed - Jet Perforation
2006-03-10 Perforation Treatment Performed - Fractured
2006-03-14 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-03-05 Perforation 225.00 228.00 13
2006-03-08 Perforation 180.00 184.00 17
2006-03-09 Perforation 144.00 148.00 7
2006-03-09 Perforation 132.50 134.00 7
2006-03-09 Perforation 123.00 127.00 7
2006-03-10 Fracture 180.00 184.00 0
2006-03-10 Fracture 144.00 148.00 0
2006-03-10 Fracture 132.50 134.00 0
2006-03-10 Fracture 123.00 127.00 0
2000-03-05 Perforation 222.00 224.00 13
2000-03-06 Packing Device Capped w/Cement 207.00 215.00 0
2000-03-06 Perforation 157.50 160.50 13
2002-03-15 Perforation 222.00 224.00 13
2002-03-15 Perforation 225.00 228.00 13
2002-05-28 Fracture 222.00 228.00 0
2002-05-29 Fracture 158.00 160.50 0
2006-03-08 Perforation 184.00 188.00 17

For data sources see[4]



References