X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364182501000

Well Details

Well ID: 0364182501000
Loading map...
Location: 00/01-25-036-18W4/0
Location Alias: 00/01-25-36-18 W4M
Location Alias 2: 00/01-25-036-18 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 18
Section: 25
County/Municipality: County of Stettler No. 6
Well Name: PCP HACKETT 1-25-36-18
Operator Name: Ovintiv Canada ULC
License Number: 0082256
License Date: 1980-04-21
License Status: RecCertified
Spud Date: 1980-04-24
Final Drill Date: 1980-04-29
Well Total Depth: 1200.00 m
Surface Hole Latitude: 52.117332
Surface Hole Longitude: -112.438755

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-04-21 Obtained License
1980-04-29 Finished Drilling
1980-04-30 Drill Stem Test Performed
1980-04-30 Well Log Performed
1980-05-01 Drill Stem Test Performed
1980-05-03 Production Casing Operation Performed
1980-05-05 Perforation Treatment Performed - Jet Perforation
1980-05-07 Perforation Treatment Performed - Jet Perforation
1980-05-08 Perforation Treatment Performed - Cement Squeeze
1980-05-22 Perforation Treatment Performed - Jet Perforation
1980-05-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-04-16 Well Mode changed to Drilled and Cased
1995-10-11 Well Log Performed
1995-10-12 Perforation Treatment Performed - Jet Perforation
1995-10-13 Well Log Performed
1995-10-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-14 Perforation Treatment Performed - Jet Perforation
1995-10-15 Well Fluid changed to Crude Oil
1995-10-15 Well Log Performed
1995-10-15 Well Mode changed to Potential
1995-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-16 Plug Back Performed
1995-10-16 Well Fluid changed to Crude Oil
1995-10-16 Well Mode changed to Abandoned Zone
1995-10-18 Well Log Performed
1995-10-19 Well Log Performed
1995-10-20 Perforation Treatment Performed - Jet Perforation
1995-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-21 Perforation Treatment Performed - Remedial Casing
1997-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-03 Perforation Treatment Performed - Jet Perforation
1997-10-04 Perforation Treatment Performed - Jet Perforation
1997-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-05 Perforation Treatment Performed - Remedial Casing
1997-10-07 Well Abandoned
1997-10-07 Well Fluid changed to Crude Oil
1997-10-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-05-05 Perforation 1155.00 1157.00 9
1995-10-16 Packing Device Capped w/Cement 507.00 515.00 0
1995-10-20 Perforation 281.00 282.00 14
1995-10-21 Acid Treatment 281.00 282.00 0
1995-10-21 Remedial Casing Cementing 281.00 282.00 0
1997-10-03 Perforation 304.50 305.50 20
1997-10-03 Acid Treatment 304.50 305.50 0
1997-10-04 Perforation 281.00 282.00 14
1997-10-05 Acid Treatment 281.00 305.50 0
1997-10-05 Remedial Casing Cementing 281.00 305.50 0
1980-05-07 Perforation 1159.00 1160.00 13
1980-05-08 Cement Squeeze 1159.00 1160.00 0
1980-05-22 Perforation 1158.50 1159.50 13
1980-05-23 Packing Device Capped w/Cement 1141.20 1150.00 0
1995-10-12 Perforation 544.00 548.00 13
1995-10-12 Perforation 550.00 552.00 13
1995-10-14 Perforation 531.00 537.00 13
1995-10-14 Packing Device Capped w/Cement 542.00 542.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 31 0.0 0.0 0.0

For data sources see[5]

References