X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364150912000

Well Details

Well ID: 0364150912000
Loading map...
Location: 00/12-09-036-15W4/0
Location Alias: 00/12-09-36-15 W4M
Location Alias 2: 00/12-09-036-15 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 15
Section: 09
County/Municipality: County of Stettler No. 6
Well Name: OMERS PCP PROVOST 12-9-36-15
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0106756
License Date: 1984-04-16
License Status: Suspension
Spud Date: 1984-04-17
Final Drill Date: 1984-04-22
Well Total Depth: 1165.00 m
Surface Hole Latitude: 52.080601
Surface Hole Longitude: -112.095236

For data sources see[1][2]

Well History

Date Event
1984-04-16 Obtained License
1984-04-22 Finished Drilling
1984-04-23 Well Log Performed
1984-04-24 Drill Stem Test Performed
1984-04-25 Production Casing Operation Performed
1984-04-25 Well Mode changed to Drilled and Cased
1984-06-21 Perforation Treatment Performed - Jet Perforation
1984-06-21 Well Log Performed
1984-07-12 Perforation Treatment Performed - Jet Perforation
1984-07-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-07-17 Perforation Treatment Performed - Jet Perforation
1984-07-17 Plug Back Performed
1984-07-17 Well Log Performed
2001-01-23 Perforation Treatment Performed - Jet Perforation
2001-01-23 Water Flow Occurred
2001-01-24 Perforation Treatment Performed - Cement Squeeze
2001-01-28 Perforation Treatment Performed - Jet Perforation
2002-11-19 Perforation Treatment Performed - Jet Perforation
2002-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-20 Plug Back Performed
2002-11-24 Well Began Production
2002-11-24 Well Fluid changed to Gas
2002-11-24 Well Mode changed to Flowing
2008-05-01 Well Fluid changed to Gas
2008-05-01 Well Mode changed to Suspended
2015-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-10-08 Perforation Treatment Performed - Cement Squeeze
2015-10-08 Plug Back Performed
2015-10-08 Well Fluid changed to Gas
2015-10-08 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-06-21 Perforation 459.00 463.00 7
2001-01-28 Perforation 994.00 997.00 13
2002-11-19 Perforation 440.00 441.00 17
2002-11-20 Packing Device Capped w/Cement 981.00 989.00 0
2015-10-08 Cement Squeeze 440.00 441.00 0
2015-10-08 Packing Device Capped w/Cement 427.00 435.80 0
1984-07-12 Perforation 469.50 470.50 7
1984-07-12 Perforation 471.00 473.00 7
1984-07-17 Packing Device Capped w/Cement 449.00 457.00 0
1984-07-17 Perforation 440.00 441.00 13
2001-01-23 Perforation 459.00 463.00 7
2001-01-23 Perforation 469.50 470.50 7
2001-01-23 Perforation 471.00 473.00 7
2001-01-24 Cement Squeeze 440.00 473.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 702 0.0 0.0 0.0
2003 324 0.0 0.0 0.0
2004 1702 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2001-01-23 Water Flow 440.00 1100.00
2002-11-20 No Incident Encountered 0.00 0.00
2015-10-09 No Incident Encountered 0.00 0.00

For data sources see[6]

References