X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364111102000

Well Details

Well ID: 0364111102000
Loading map...
Location: 00/02-11-036-11W4/0
Location Alias: 00/02-11-36-11 W4M
Location Alias 2: 00/02-11-036-11 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 11
Section: 11
County/Municipality: County of Paintearth No. 18
Well Name: LL&E ET AL HAMIL IN 2-11-36-11
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0034676
License Date: 1968-08-22
License Status: RecCertified
Spud Date: 1968-09-04
Final Drill Date: 1968-09-06
Well Total Depth: 928.70 m
Surface Hole Latitude: 52.072040
Surface Hole Longitude: -111.466160

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-08-22 Obtained License
1968-09-06 Finished Drilling
1968-09-06 Production Casing Operation Performed
1968-09-06 Well Mode changed to Drilled and Cased
1968-12-14 Perforation Treatment Performed - Jet Perforation
1968-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-01-13 Well Began Injection
1969-01-13 Well Fluid changed to Water
1969-01-13 Well Type changed to Injection
1998-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-10-28 Perforation Treatment Performed - Jet Perforation
1998-10-28 Plug Back Performed
1998-10-29 Perforation Treatment Performed - Remedial Casing
1998-10-31 Well Abandoned
1998-10-31 Well Fluid changed to Water
1998-10-31 Well Mode changed to Abandoned
1998-10-31 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-12-14 Perforation 910.10 911.40 13
1968-12-17 Acid Treatment 910.10 911.40 0
1998-10-28 Packing Device Capped w/Cement 892.00 900.00 0
1998-10-28 Perforation 277.00 278.00 7
1998-10-29 Remedial Casing Cementing 277.00 278.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0

For data sources see[5]

References