X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364082912C00

Well Details

Well ID: 0364082912C00
Loading map...
Location: C0/12-29-036-08W4/0
Location Alias: C0/12-29-36-08 W4M
Location Alias 2: C0/12-29-036-08 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 08
Section: 29
County/Municipality: Special Areas No. 4
Well Name: PENN WEST PROVOST 12-29-36-8
Operator Name: Obsidian Energy Ltd.
License Number: 0141165
License Date: 1989-10-05
License Status: RecExempt
Spud Date: 1989-10-16
Final Drill Date: 1989-10-19
Well Total Depth: 1082.00 m
Surface Hole Latitude: 52.122070
Surface Hole Longitude: -111.121829

For data sources see[1][2]

Well History

Date Event
1989-10-05 Obtained License
1989-10-16 Surface Casing Operation Performed
1989-10-17 Direction Drilling Operation Performed - Deviate
1989-10-19 Finished Drilling
1989-10-19 Well Mode changed to Drilled and Cased
1989-10-20 Production Casing Operation Performed
1989-10-20 Rig Released
1989-10-20 Well Log Performed
1989-10-30 Perforation Treatment Performed - Jet Perforation
1989-10-30 Well Log Performed
1989-11-14 Well Began Production
1989-11-14 Well Fluid changed to Crude Oil
1989-11-14 Well Mode changed to Pumping
1998-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-29 Perforation Treatment Performed - Jet Perforation
1998-07-29 Plug Back Performed
1998-07-29 Well Log Performed
1998-07-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-30 Plug Back Performed
1998-07-30 Well Log Performed
1998-10-06 Well Abandoned
1998-10-06 Well Fluid changed to Crude Oil
1998-10-06 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1989-10-17 400.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-10-30 Perforation 1047.00 1050.00 13
1998-07-29 Packing Device Capped w/Cement 1037.00 1045.00 0
1998-07-29 Perforation 933.00 938.00 13
1998-07-30 Packing Device Capped w/Cement 922.00 930.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 1148 0.0 0.0 0.0
1990 8328 0.0 0.0 0.0
1991 8068 0.0 0.0 0.0
1992 8464 0.0 0.0 0.0
1993 8456 0.0 0.0 0.0
1994 8445 0.0 0.0 0.0
1995 7524 0.0 0.0 0.0
1996 8527 0.0 0.0 0.0
1997 7954 0.0 0.0 0.0
1998 4390 0.0 0.0 0.0

For data sources see[6]

References