X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364082907C00

Well Details

Well ID: 0364082907C00
Loading map...
Location: C0/07-29-036-08W4/0
Location Alias: C0/07-29-36-08 W4M
Location Alias 2: C0/07-29-036-08 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 08
Section: 29
County/Municipality: Special Areas No. 4
Well Name: PENN WEST PROVOST 7-29-36-8
Operator Name: Obsidian Energy Ltd.
License Number: 0146344
License Date: 1990-11-15
License Status: RecExempt
Spud Date: 1990-11-16
Final Drill Date: 1990-11-21
Well Total Depth: 1112.00 m
Surface Hole Latitude: 52.122340
Surface Hole Longitude: -111.107084

For data sources see[1][2]

Well History

Date Event
1990-11-15 Obtained License
1990-11-17 Surface Casing Operation Performed
1990-11-18 Direction Drilling Operation Performed - Deviate
1990-11-21 Finished Drilling
1990-11-21 Well Log Performed
1990-11-21 Well Mode changed to Drilled and Cased
1990-11-22 Production Casing Operation Performed
1990-11-22 Rig Released
1990-11-26 Well Log Performed
1990-12-03 Well Log Performed
1990-12-08 Well Log Performed
1990-12-09 Perforation Treatment Performed - Jet Perforation
1991-01-24 Well Began Production
1991-01-24 Well Fluid changed to Crude Oil
1991-01-24 Well Mode changed to Pumping
1997-09-30 Well Fluid changed to Crude Oil
1997-09-30 Well Mode changed to Suspended
1998-01-01 Well Fluid changed to Crude Oil
1998-01-01 Well Mode changed to Pumping
1998-07-01 Well Fluid changed to Crude Oil
1998-07-01 Well Mode changed to Suspended
1998-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-10-23 Plug Back Performed
1998-10-23 Well Log Performed
1998-10-29 Well Abandoned
1998-10-29 Well Fluid changed to Crude Oil
1998-10-29 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-11-18 395.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-12-09 Perforation 1067.00 1068.00 13
1990-12-09 Perforation 1069.50 1071.00 13
1998-10-23 Packing Device Capped w/Cement 1054.00 1062.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 7512 0.0 0.0 0.0
1992 8509 0.0 0.0 0.0
1993 8176 0.0 0.0 0.0
1994 8157 0.0 0.0 0.0
1995 8665 0.0 0.0 0.0
1996 6986 0.0 0.0 0.0
1997 4719 0.0 0.0 0.0
1998 3966 0.0 0.0 0.0

For data sources see[6]

References