X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364053604023

Well Details

Well ID: 0364053604023
Loading map...
Location: 02/04-36-036-05W4/3
Location Alias: 02/04-36-36-05 W4M
Location Alias 2: 02/04-36-036-05 W4/03
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 05
Section: 36
County/Municipality: Special Areas No. 4
Well Name: BARR ET AL 4A PROVOST 4-36-36-5
Operator Name: Surge Energy Inc.
License Number: 0159167
License Date: 1993-06-15
License Status: Amended
Spud Date: 1993-06-16
Final Drill Date: 1993-06-19
Well Total Depth: 895.00 m
Surface Hole Latitude: 52.129647
Surface Hole Longitude: -110.593024

For data sources see[1][2]

Well History

Date Event
1993-06-05 Well Log Performed
1993-06-15 Obtained License
1993-06-17 Surface Casing Operation Performed
1993-06-18 Direction Drilling Operation Performed - Deviate
1993-06-19 Finished Drilling
1993-06-19 Well Mode changed to Drilled and Cased
1993-06-20 Production Casing Operation Performed
1993-06-20 Well Log Performed
1993-06-21 Rig Released
1993-07-10 Well Log Performed
1993-07-11 Perforation Treatment Performed - Jet Perforation
1993-07-11 Well Log Performed
1997-03-13 Perforation Treatment Performed - Jet Perforation
1997-03-13 Well Log Performed
2013-11-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-11-12 Plug Back Performed
2013-11-13 Perforation Treatment Performed - Jet Perforation
2013-11-26 Perforation Treatment Performed - Fractured
2013-12-01 Well Began Production
2013-12-01 Well Fluid changed to Crude Oil
2013-12-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-06-18 252.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-07-11 Perforation 857.50 859.00 14
1997-03-13 Perforation 846.00 849.00 18
2013-11-12 Packing Device Capped w/Cement 835.00 843.00 0
2013-11-12 Packing Device Capped w/Cement 853.50 856.50 0
2013-11-13 Perforation 806.00 809.00 17
2013-11-13 Perforation 804.00 805.00 17
2013-11-13 Perforation 812.00 815.00 17
2013-11-26 Fracture 804.00 815.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 384 0.0 0.0 0.0
2014 8334 0.0 0.0 0.0
2015 8328 0.0 0.0 0.0
2016 8388 0.0 0.0 0.0
2017 8280 0.0 0.0 0.0
2018 7187 0.0 0.0 0.0
2019 6819 0.0 0.0 0.0
2020 2050 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-09-14 No Incident Encountered 0.00 0.00
1997-03-13 No Incident Encountered 0.00 0.00
2013-12-01 No Incident Encountered 0.00 0.00

For data sources see[7]

References