X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364053416002

Well Details

Well ID: 0364053416002
Loading map...
Location: 00/16-34-036-05W4/2
Location Alias: 00/16-34-36-05 W4M
Location Alias 2: 00/16-34-036-05 W4/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 05
Section: 34
County/Municipality: Special Areas No. 4
Well Name: SURGE ENERGY HZ PROVOST 16-34-36-5
Operator Name: Surge Energy Inc.
License Number: 0435798
License Date: 2011-08-05
License Status: Suspension
Spud Date: 2011-09-06
Final Drill Date: 2011-09-23
Well Total Depth: 2002.00 m
Surface Hole Latitude: 52.139098
Surface Hole Longitude: -110.646658

For data sources see[1][2]

Well History

Date Event
2011-08-05 Obtained License
2011-09-07 Surface Casing Operation Performed
2011-09-09 Direction Drilling Operation Performed - Horizontal
2011-09-17 Direction Drilling Operation Performed - Sidetrack Fish
2011-09-23 Finished Drilling
2011-09-23 Well Log Performed
2011-09-23 Well Mode changed to Drilled and Cased
2011-09-26 Production Casing Operation Performed
2011-09-26 Rig Released
2011-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-08 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-10 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-22 Well Began Production
2011-10-22 Well Fluid changed to Crude Oil
2011-10-22 Well Mode changed to Pumping
2019-06-01 Well Fluid changed to Crude Oil
2019-06-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-09 600.00 Horizontal
2011-09-17 660.00 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-07 Multi-Stage Fracture 1990.00 1990.10 0
2011-10-09 Multi-Stage Fracture 1390.30 1390.40 0
2011-10-09 Multi-Stage Fracture 1296.00 1296.10 0
2011-10-10 Multi-Stage Fracture 1197.00 1197.10 0
2011-10-10 Multi-Stage Fracture 1103.90 1104.00 0
2011-10-10 Multi-Stage Fracture 1030.50 1030.60 0
2011-10-07 Multi-Stage Fracture 1927.70 1927.80 0
2011-10-08 Multi-Stage Fracture 1839.80 1839.90 0
2011-10-08 Multi-Stage Fracture 1774.00 1774.10 0
2011-10-09 Multi-Stage Fracture 1767.60 1767.70 0
2011-10-09 Multi-Stage Fracture 1684.60 1684.70 0
2011-10-09 Multi-Stage Fracture 1586.70 1586.80 0
2011-10-09 Multi-Stage Fracture 1581.50 1581.60 0
2011-10-09 Multi-Stage Fracture 1488.00 1488.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1652 0.0 0.0 0.0
2012 7572 0.0 0.0 0.0
2013 8634 0.0 0.0 0.0
2014 8594 0.0 0.0 0.0
2015 6422 0.0 0.0 0.0
2016 7514 0.0 0.0 0.0

For data sources see[6]

References