X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364052515A02

Well Details

Well ID: 0364052515A02
Loading map...
Location: A0/15-25-036-05W4/2
Location Alias: A0/15-25-36-05 W4M
Location Alias 2: A0/15-25-036-05 W4/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 05
Section: 25
County/Municipality: Special Areas No. 4
Well Name: CRESCENT POINT PROVO 15-25-36-5
Operator Name: Surge Energy Inc.
License Number: 0151357
License Date: 1992-01-15
License Status: Issued
Spud Date: 1992-01-31
Final Drill Date: 1995-02-17
Well Total Depth: 1010.00 m
Surface Hole Latitude: 52.126331
Surface Hole Longitude: -110.583408

For data sources see[1][2]

Well History

Date Event
1992-01-15 Obtained License
1992-02-01 Surface Casing Operation Performed
1992-02-04 Intermediate Casing Operation Performed
1992-02-12 Perforation Treatment Performed - Jet Perforation
1994-04-21 Perforation Treatment Performed - Jet Perforation
1995-01-14 Perforation Treatment Performed - Cement Squeeze
1995-01-14 Plug Back Performed
1995-02-17 Finished Drilling
1995-02-17 Perforation Treatment Performed - Open-Hole Completion
1995-02-17 Well Mode changed to Drilled and Cased
1995-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-02-19 Rig Released
1995-05-10 Well Began Injection
1995-05-10 Well Fluid changed to Water
1995-05-10 Well Type changed to Disposal
1997-04-22 Well Fluid changed to Water
1997-04-22 Well Mode changed to Suspended
1997-04-22 Well Type changed to Disposal
2000-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-07-08 Perforation Treatment Performed - Jet Perforation
2000-07-08 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2000-07-08 Plug Back Performed
2000-07-08 Well Fluid changed to Water
2000-07-08 Well Mode changed to Abandoned Zone
2000-07-08 Well Type changed to Disposal
2000-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-23 Plug Back Performed
2008-07-23 Perforation Treatment Performed - Fractured
2008-07-23 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-02-12 Perforation 837.00 838.00 19
2008-07-23 Perforation 783.50 786.50 17
2008-07-23 Perforation 776.00 780.00 17
2008-07-23 Fracture 776.00 786.50 0
1994-04-21 Perforation 838.00 839.30 17
1995-01-14 Cement Squeeze 837.00 839.30 0
1995-02-17 Open Hole/Barefoot Completion 852.00 1010.00 0
1995-02-18 Acid Treatment 852.00 1010.00 0
2000-07-08 Packing Dev Cpd w/Res-Gyp Cem 834.00 835.00 0
2000-07-08 Perforation 825.00 828.00 17
2000-07-08 Acid Treatment 825.00 828.00 0
2000-07-23 Packing Device Capped w/Cement 807.00 815.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0

For data sources see[5]

References