X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364052515002

Well Details

Well ID: 0364052515002
Loading map...
Location: 00/15-25-036-05W4/2
Location Alias: 00/15-25-36-05 W4M
Location Alias 2: 00/15-25-036-05 W4/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 05
Section: 25
County/Municipality: Special Areas No. 4
Well Name: CRESCENT POINT PROVO 15-25-36-5
Operator Name: Surge Energy Inc.
License Number: 0121301
License Date: 1986-01-10
License Status: Abandoned
Spud Date: 1986-01-10
Final Drill Date: 1986-01-14
Well Total Depth: 871.00 m
Surface Hole Latitude: 52.127328
Surface Hole Longitude: -110.584151

For data sources see[1][2]

Well History

Date Event
1986-01-10 Obtained License
1986-01-11 Surface Casing Operation Performed
1986-01-14 Finished Drilling
1986-01-14 Well Log Performed
1986-01-15 Production Casing Operation Performed
1986-01-15 Rig Released
1986-03-25 Well Log Performed
1986-03-26 Perforation Treatment Performed - Jet Perforation
1986-03-27 Perforation Treatment Performed - Fractured
1986-03-30 Well Log Performed
1988-01-23 Well Log Performed
1988-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-01-24 Perforation Treatment Performed - Cement Squeeze
1988-01-24 Plug Back Performed
1988-01-28 Well Log Performed
1988-01-29 Perforation Treatment Performed - Jet Perforation
1988-01-29 Well Mode changed to Drilled and Cased
2007-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-08 Plug Back Performed
2007-11-08 Well Mode changed to Abandoned Zone
2018-11-01 Well Abandoned
2018-11-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-03-26 Perforation 825.50 828.00 13
1986-03-27 Fracture 825.50 828.00 0
1988-01-24 Acid Treatment 825.50 828.00 0
1988-01-24 Cement Squeeze 825.50 828.00 0
1988-01-29 Perforation 838.00 839.50 13
2007-11-08 Packing Device Capped w/Cement 825.00 833.00 0

For data sources see[4]



References