X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364052507D00

Well Details

Well ID: 0364052507D00
Loading map...
Location: D0/07-25-036-05W4/0
Location Alias: D0/07-25-36-05 W4M
Location Alias 2: D0/07-25-036-05 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 05
Section: 25
County/Municipality: Special Areas No. 4
Well Name: CRESCENT POINT PROVO 7-25-36-5
Operator Name: Surge Energy Inc.
License Number: 0151353
License Date: 1992-01-15
License Status: Amended
Spud Date: 1992-01-28
Final Drill Date: 1992-01-31
Well Total Depth: 881.00 m
Surface Hole Latitude: 52.119973
Surface Hole Longitude: -110.586185

For data sources see[1][2]

Well History

Date Event
1992-01-15 Obtained License
1992-01-29 Surface Casing Operation Performed
1992-01-31 Finished Drilling
1992-01-31 Well Log Performed
1992-01-31 Well Mode changed to Drilled and Cased
1992-02-01 Production Casing Operation Performed
1992-02-01 Rig Released
1992-02-06 Well Log Performed
1992-02-10 Perforation Treatment Performed - Jet Perforation
1992-02-10 Well Log Performed
1992-02-19 Well Log Performed
1992-02-22 Well Began Production
1992-02-22 Well Fluid changed to Crude Oil
1992-02-22 Well Mode changed to Pumping
2000-05-04 Well Fluid changed to Crude Oil
2000-05-04 Well Mode changed to Suspended
2000-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-11 Perforation Treatment Performed - Jet Perforation
2000-07-11 Plug Back Performed
2000-07-11 Well Fluid changed to Crude Oil
2000-07-11 Well Log Performed
2000-07-11 Well Mode changed to Abandoned Zone
2000-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-05 Perforation Treatment Performed - Cement Squeeze
2010-10-05 Plug Back Performed
2010-10-09 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-02-10 Perforation 853.70 854.70 19
1992-02-10 Perforation 855.20 856.20 19
2000-07-11 Packing Device Capped w/Cement 848.00 849.00 0
2000-07-11 Perforation 841.00 844.00 17
2000-07-11 Perforation 844.60 846.00 17
2000-07-12 Acid Treatment 841.00 846.00 0
2010-10-05 Cement Squeeze 841.00 846.00 0
2010-10-09 Perforation 853.70 856.20 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 7115 0.0 0.0 0.0
1993 8030 0.0 0.0 0.0
1994 8371 0.0 0.0 0.0
1995 7203 0.0 0.0 0.0
1996 4938 0.0 0.0 0.0
1997 274 0.0 0.0 0.0
1998 5817 0.0 0.0 0.0

For data sources see[5]

References