X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364052501040

Well Details

Well ID: 0364052501040
Loading map...
Location: 04/01-25-036-05W4/0
Location Alias: 04/01-25-36-05 W4M
Location Alias 2: 04/01-25-036-05 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 05
Section: 25
County/Municipality: Special Areas No. 4
Well Name: CRESCENT POINT PROVO 1-25-36-5
Operator Name: Surge Energy Inc.
License Number: 0148523
License Date: 1991-03-28
License Status: Issued
Spud Date: 1991-04-03
Final Drill Date: 1991-04-07
Well Total Depth: 999.00 m
Surface Hole Latitude: 52.116916
Surface Hole Longitude: -110.581489

For data sources see[1][2]

Well History

Date Event
1991-03-28 Obtained License
1991-04-04 Surface Casing Operation Performed
1991-04-06 Lost Circulation Occurred
1991-04-07 Finished Drilling
1991-04-07 Well Mode changed to Drilled and Cased
1991-04-10 Production Casing Operation Performed
1991-04-10 Rig Released
1991-05-25 Well Log Performed
1991-05-29 Perforation Treatment Performed - Jet Perforation
1991-05-30 Perforation Treatment Performed - Cement Squeeze
1991-06-05 Perforation Treatment Performed - Cement Squeeze
1991-06-05 Perforation Treatment Performed - Jet Perforation
1991-06-08 Perforation Treatment Performed - Jet Perforation
1991-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-11-23 Well Began Injection
1991-11-23 Well Fluid changed to Water
1991-11-23 Well Type changed to Disposal
2001-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-25 Perforation Treatment Performed - Jet Perforation
2001-01-25 Plug Back Performed
2001-01-25 Well Fluid changed to Water
2001-01-25 Well Log Performed
2001-01-25 Well Mode changed to Abandoned Zone
2001-01-25 Well Type changed to Disposal
2003-08-30 Well Log Performed
2003-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-08-31 Perforation Treatment Performed - Jet Perforation
2003-08-31 Plug Back Performed
2003-10-04 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-05-29 Perforation 948.00 951.00 13
2003-08-31 Packing Device Capped w/Cement 843.00 851.00 0
2003-08-31 Perforation 779.00 787.00 13
2003-10-04 Fracture 779.00 787.00 0
1991-05-30 Cement Squeeze 948.00 951.00 0
1991-06-05 Perforation 888.00 890.00 19
1991-06-05 Cement Squeeze 888.00 890.00 0
1991-06-08 Perforation 964.00 975.00 18
1991-06-08 Perforation 982.00 987.00 18
1991-06-10 Acid Treatment 964.00 987.00 0
2001-01-25 Packing Device Capped w/Cement 942.00 950.00 0
2001-01-25 Perforation 854.00 862.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1991-04-06 Lost Circulation 950.00 999.00

For data sources see[6]

References