X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364052501030

Well Details

Well ID: 0364052501030
Loading map...
Location: 03/01-25-036-05W4/0
Location Alias: 03/01-25-36-05 W4M
Location Alias 2: 03/01-25-036-05 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 05
Section: 25
County/Municipality: Special Areas No. 4
Well Name: CRESCENT POINT PROVO 1-25-36-5
Operator Name: Surge Energy Inc.
License Number: 0147905
License Date: 1991-02-11
License Status: Issued
Spud Date: 1991-02-15
Final Drill Date: 1991-02-17
Well Total Depth: 861.00 m
Surface Hole Latitude: 52.114832
Surface Hole Longitude: -110.578016

For data sources see[1][2]

Well History

Date Event
1991-02-11 Obtained License
1991-02-16 Surface Casing Operation Performed
1991-02-17 Finished Drilling
1991-02-17 Well Log Performed
1991-02-17 Well Mode changed to Drilled and Cased
1991-02-18 Production Casing Operation Performed
1991-02-18 Rig Released
1991-02-26 Perforation Treatment Performed - Jet Perforation
1991-02-26 Well Log Performed
1991-04-01 Well Began Production
1991-04-01 Well Fluid changed to Crude Oil
1991-04-01 Well Mode changed to Pumping
2000-05-04 Well Fluid changed to Crude Oil
2000-05-04 Well Mode changed to Suspended
2000-05-14 Well Fluid changed to Crude Oil
2000-05-14 Well Mode changed to Pumping
2000-07-15 Well Fluid changed to Crude Oil
2000-07-15 Well Mode changed to Suspended
2002-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-08-25 Perforation Treatment Performed - Jet Perforation
2002-08-25 Plug Back Performed
2002-08-25 Well Fluid changed to Crude Oil
2002-08-25 Well Mode changed to Abandoned Zone
2002-08-28 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-02-26 Perforation 839.30 841.30 19
2002-08-25 Packing Device Capped w/Cement 828.00 836.00 0
2002-08-25 Perforation 778.00 782.50 13
2002-08-25 Perforation 782.50 787.00 13
2002-08-28 Fracture 778.00 787.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 2854 0.0 0.0 0.0
1992 8125 0.0 0.0 0.0
1993 5453 0.0 0.0 0.0
2000 604 0.0 0.0 0.0

For data sources see[5]

References