X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364052501022

Well Details

Well ID: 0364052501022
Loading map...
Location: 02/01-25-036-05W4/2
Location Alias: 02/01-25-36-05 W4M
Location Alias 2: 02/01-25-036-05 W4/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 05
Section: 25
County/Municipality: Special Areas No. 4
Well Name: 935247 ET AL PROVO 1-25-36-5
Operator Name: Surge Energy Inc.
License Number: 0073228
License Date: 1978-11-29
License Status: Issued
Spud Date: 1978-11-15
Final Drill Date: 1978-11-21
Well Total Depth: 884.00 m
Surface Hole Latitude: 52.115740
Surface Hole Longitude: -110.578444

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-11-21 Finished Drilling
1978-11-21 Well Log Performed
1978-11-21 Well Mode changed to Drilled and Cased
1978-11-22 Drill Stem Test Performed
1978-11-24 Production Casing Operation Performed
1978-11-29 Obtained License
1978-12-16 Perforation Treatment Performed - Jet Perforation
1980-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-20 Perforation Treatment Performed - Jet Perforation
1980-11-24 Well Began Production
1980-11-24 Well Fluid changed to Crude Oil
1980-11-24 Well Mode changed to Pumping
1995-04-12 Well Log Performed
1995-04-13 Perforation Treatment Performed - Jet Perforation
1995-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-17 Well Log Performed
1995-04-29 Well Began Injection
1995-04-29 Well Fluid changed to Water
1995-04-29 Well Type changed to Disposal
1995-05-28 Well Fluid changed to Water
1995-05-28 Well Mode changed to Suspended
1995-05-28 Well Type changed to Disposal
2006-04-01 Well Fluid changed to Water
2006-04-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-12-16 Perforation 842.00 843.00 13
1980-10-20 Packing Device Capped w/Cement 840.00 840.00 0
1980-10-20 Perforation 831.50 832.50 13
1995-04-13 Perforation 829.00 835.00 20
1995-04-17 Acid Treatment 829.00 835.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 882 0.0 0.0 0.0
1981 8340 0.0 0.0 0.0
1982 7327 0.0 0.0 0.0
1983 8153 0.0 0.0 0.0
1984 8783 0.0 0.0 0.0
1985 8759 0.0 0.0 0.0
1986 8687 0.0 0.0 0.0
1987 8759 0.0 0.0 0.0
1988 8783 0.0 0.0 0.0
1989 8759 0.0 0.0 0.0
1990 8255 0.0 0.0 0.0
1991 8460 0.0 0.0 0.0
1992 8591 0.0 0.0 0.0
1993 8727 0.0 0.0 0.0
1994 8726 0.0 0.0 0.0
1995 2188 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References