X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364052416B03

Well Details

Well ID: 0364052416B03
Loading map...
Location: B0/16-24-036-05W4/3
Location Alias: B0/16-24-36-05 W4M
Location Alias 2: B0/16-24-036-05 W4/03
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 05
Section: 24
County/Municipality: Special Areas No. 4
Well Name: CRESCENT POINT PROVO 16-24-36-5
Operator Name: Surge Energy Inc.
License Number: 0151358
License Date: 1992-01-15
License Status: Amended
Spud Date: 1992-01-27
Final Drill Date: 1992-01-30
Well Total Depth: 888.00 m
Surface Hole Latitude: 52.113161
Surface Hole Longitude: -110.580361

For data sources see[1][2]

Well History

Date Event
1992-01-15 Obtained License
1992-01-28 Direction Drilling Operation Performed - Deviate
1992-01-28 Surface Casing Operation Performed
1992-01-30 Finished Drilling
1992-01-30 Production Casing Operation Performed
1992-01-30 Well Log Performed
1992-01-30 Well Mode changed to Drilled and Cased
1992-01-31 Rig Released
1992-02-06 Well Log Performed
1992-02-08 Perforation Treatment Performed - Jet Perforation
1992-02-08 Well Log Performed
1997-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-15 Perforation Treatment Performed - Jet Perforation
1997-09-15 Plug Back Performed
1997-09-15 Well Log Performed
2003-07-23 Perforation Treatment Performed - Cement Squeeze
2003-07-23 Plug Back Performed
2003-07-23 Well Log Performed
2003-08-14 Perforation Treatment Performed - Jet Perforation
2003-08-14 Well Log Performed
2003-09-08 Perforation Treatment Performed - Fractured
2003-10-01 Well Began Production
2003-10-01 Well Fluid changed to Crude Oil
2003-10-01 Well Mode changed to Pumping
2011-08-31 Well Fluid changed to Crude Oil
2011-08-31 Well Mode changed to Suspended
2012-02-11 Perforation Treatment Performed - Jet Perforation
2012-02-11 Well Log Performed
2012-02-16 Perforation Treatment Performed - Fractured
2012-02-24 Well Log Performed
2012-08-01 Well Began Injection
2012-08-01 Well Fluid changed to Water
2012-08-01 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-01-28 133.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-02-08 Perforation 863.50 865.50 19
2012-02-11 Perforation 800.00 810.50 17
2012-02-16 Fracture 800.00 810.50 0
1997-09-15 Packing Device Capped w/Cement 832.00 840.00 0
1997-09-15 Perforation 237.00 241.00 17
1997-09-15 Perforation 234.00 237.00 17
1997-09-15 Perforation 227.00 230.00 17
1997-09-15 Perforation 222.00 225.00 17
2003-07-23 Cement Squeeze 222.00 241.00 0
2003-08-14 Perforation 808.50 810.00 13
2003-09-08 Fracture 808.50 810.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 1560 0.0 0.0 0.0
2004 7399 0.0 0.0 0.0
2005 8017 0.0 0.0 0.0
2006 6789 0.0 0.0 0.0
2007 8612 0.0 0.0 0.0
2008 8644 0.0 0.0 0.0
2009 7445 0.0 0.0 0.0
2010 4572 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0

For data sources see[6]

References