X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364052416030

Well Details

Well ID: 0364052416030
Loading map...
Location: 03/16-24-036-05W4/0
Location Alias: 03/16-24-36-05 W4M
Location Alias 2: 03/16-24-036-05 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 05
Section: 24
County/Municipality: Special Areas No. 4
Well Name: CRESCENT POINT PROVO 16-24-36-5
Operator Name: Surge Energy Inc.
License Number: 0228296
License Date: 1999-11-04
License Status: Abandoned
Spud Date: 1999-11-15
Final Drill Date: 1999-11-19
Well Total Depth: 895.00 m
Surface Hole Latitude: 52.111443
Surface Hole Longitude: -110.577911

For data sources see[1][2]

Well History

Date Event
1999-11-04 Obtained License
1999-11-15 Surface Casing Operation Performed
1999-11-16 Direction Drilling Operation Performed - Deviate
1999-11-18 Well Log Performed
1999-11-19 Finished Drilling
1999-11-19 Production Casing Operation Performed
1999-11-19 Rig Released
1999-11-19 Well Mode changed to Drilled and Cased
1999-11-24 Well Log Performed
1999-11-25 Perforation Treatment Performed - Jet Perforation
1999-11-25 Well Began Production
1999-11-25 Well Fluid changed to Crude Oil
1999-11-25 Well Mode changed to Pumping
1999-11-30 Well Log Performed
2010-08-31 Well Fluid changed to Crude Oil
2010-08-31 Well Mode changed to Suspended
2015-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-08-31 Plug Back Performed
2015-08-31 Well Fluid changed to Crude Oil
2015-08-31 Well Mode changed to Abandoned Zone
2015-09-01 Perforation Treatment Performed - Cement Plug
2015-09-01 Plug Back Performed
2015-09-15 Well Abandoned
2015-09-15 Well Fluid changed to Crude Oil
2015-09-15 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-11-16 352.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-11-25 Perforation 869.00 869.50 17
2015-08-31 Packing Device Capped w/Cement 854.00 862.00 0
2015-09-01 Cement Plug 779.10 844.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 833 0.0 0.0 0.0
2000 8692 0.0 0.0 0.0
2001 8286 0.0 0.0 0.0
2003 24 0.0 0.0 0.0
2004 744 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-09-02 No Incident Encountered 0.00 0.00

For data sources see[7]

References