If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364043103023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.128814,"lon":-110.565522,"icon":""}]} |
Location: 02/03-31-036-04W4/3 | |
Location Alias: 02/03-31-36-04 W4M | |
Location Alias 2: 02/03-31-036-04 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 04 | |
Section: 31 | |
County/Municipality: Special Areas No. 4 | |
Well Name: CRESCENT POINT PROVO 3-31-36-4 | |
Operator Name: Surge Energy Inc. | |
License Number: 0152067 | |
License Date: 1992-03-23 | |
License Status: Suspension | |
Spud Date: 1992-03-24 | |
Final Drill Date: 1995-02-08 | |
Well Total Depth: 991.00 m | |
Surface Hole Latitude: 52.128814 | |
Surface Hole Longitude: -110.565522 |
Date | Event |
---|---|
1992-03-23 | Obtained License |
1992-03-24 | Surface Casing Operation Performed |
1992-03-27 | Production Casing Operation Performed |
1992-04-07 | Perforation Treatment Performed - Jet Perforation |
1992-04-09 | Perforation Treatment Performed - Fractured |
1992-06-12 | Perforation Treatment Performed - Jet Perforation |
1992-07-21 | Perforation Treatment Performed - Fractured |
1995-02-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-02-05 | Perforation Treatment Performed - Cement Squeeze |
1995-02-05 | Plug Back Performed |
1995-02-08 | Finished Drilling |
1995-02-08 | Perforation Treatment Performed - Open-Hole Completion |
1995-02-08 | Well Mode changed to Drilled and Cased |
1995-02-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-02-10 | Rig Released |
2001-01-06 | Perforation Treatment Performed - Jet Perforation |
2001-01-06 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2001-01-06 | Plug Back Performed |
2001-01-06 | Well Log Performed |
2001-03-03 | Well Began Production |
2001-03-03 | Well Fluid changed to Gas |
2001-03-03 | Well Mode changed to Flowing |
2004-12-01 | Well Fluid changed to Gas |
2004-12-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1992-04-07 | Perforation | 830.00 | 831.40 | 19 |
2001-01-06 | Perforation | 757.00 | 761.00 | 17 |
1992-04-09 | Fracture | 830.00 | 831.40 | 0 |
1992-06-12 | Perforation | 830.00 | 832.40 | 19 |
1992-07-21 | Fracture | 830.00 | 832.40 | 0 |
1995-02-05 | Acid Treatment | 830.00 | 832.40 | 0 |
1995-02-05 | Cement Squeeze | 830.00 | 832.40 | 0 |
1995-02-08 | Open Hole/Barefoot Completion | 854.00 | 991.00 | 0 |
1995-02-09 | Acid Treatment | 854.00 | 991.00 | 0 |
2001-01-06 | Packing Dev Cpd w/Res-Gyp Cem | 841.00 | 844.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 6155 | 0.0 | 0.0 | 0.0 |
2002 | 5979 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2001-01-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]