If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364043008020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.120343,"lon":-110.555022,"icon":""}]} |
Location: 02/08-30-036-04W4/0 | |
Location Alias: 02/08-30-36-04 W4M | |
Location Alias 2: 02/08-30-036-04 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 04 | |
Section: 30 | |
County/Municipality: Special Areas No. 4 | |
Well Name: 935247 ET AL PROVO 8-30-36-4 | |
Operator Name: Surge Energy Inc. | |
License Number: 0186810 | |
License Date: 1996-03-14 | |
License Status: Issued | |
Spud Date: 1996-03-14 | |
Final Drill Date: 1996-03-17 | |
Well Total Depth: 861.00 m | |
Surface Hole Latitude: 52.120343 | |
Surface Hole Longitude: -110.555022 |
Date | Event |
---|---|
1996-03-14 | Obtained License |
1996-03-15 | Surface Casing Operation Performed |
1996-03-17 | Finished Drilling |
1996-03-17 | Well Log Performed |
1996-03-17 | Well Mode changed to Drilled and Cased |
1996-03-18 | Production Casing Operation Performed |
1996-03-18 | Rig Released |
1996-03-22 | Perforation Treatment Performed - Jet Perforation |
1996-03-22 | Well Log Performed |
1996-03-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-03-24 | Perforation Treatment Performed - Jet Perforation |
1996-03-24 | Plug Back Performed |
1996-03-24 | Well Log Performed |
1996-03-26 | Well Began Production |
1996-03-26 | Well Fluid changed to Crude Oil |
1996-03-26 | Well Mode changed to Pumping |
2007-05-28 | Perforation Treatment Performed - Cement Squeeze |
2007-05-28 | Plug Back Performed |
2007-05-28 | Well Fluid changed to Crude Oil |
2007-05-28 | Well Mode changed to Abandoned Zone |
2007-05-31 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-03-22 | Perforation | 836.00 | 837.00 | 17 |
1996-03-24 | Packing Device Capped w/Cement | 834.00 | 835.00 | 0 |
1996-03-24 | Perforation | 823.50 | 826.00 | 17 |
2007-05-28 | Cement Squeeze | 823.00 | 826.00 | 0 |
2007-05-31 | Perforation | 835.50 | 838.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 6581 | 0.0 | 0.0 | 0.0 |
1997 | 8542 | 0.0 | 0.0 | 0.0 |
1998 | 8599 | 0.0 | 0.0 | 0.0 |
1999 | 8645 | 0.0 | 0.0 | 0.0 |
2000 | 8340 | 0.0 | 0.0 | 0.0 |
2001 | 8111 | 0.0 | 0.0 | 0.0 |
2002 | 8744 | 0.0 | 0.0 | 0.0 |
2003 | 7576 | 0.0 | 0.0 | 0.0 |
2004 | 7451 | 0.0 | 0.0 | 0.0 |
2005 | 8039 | 0.0 | 0.0 | 0.0 |
2006 | 8028 | 0.0 | 0.0 | 0.0 |
2007 | 3493 | 0.0 | 0.0 | 0.0 |
For data sources see[5]