X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364033404000

Well Details

Well ID: 0364033404000
Loading map...
Location: 00/04-34-036-03W4/0
Location Alias: 00/04-34-36-03 W4M
Location Alias 2: 00/04-34-036-03 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 03
Section: 34
County/Municipality: Municipal District of Provost No. 52
Well Name: FCE PROVOST 4-34-36-3
Operator Name: Battle River Energy Ltd.
License Number: 0191045
License Date: 1996-09-05
License Status: Issued
Spud Date: 1996-09-14
Final Drill Date: 1996-09-16
Well Total Depth: 868.00 m
Surface Hole Latitude: 52.131413
Surface Hole Longitude: -110.360428

For data sources see[1][2]

Well History

Date Event
1996-09-05 Obtained License
1996-09-14 Well Log Performed
1996-09-15 Surface Casing Operation Performed
1996-09-16 Finished Drilling
1996-09-16 Well Mode changed to Drilled and Cased
1996-09-17 Well Log Performed
1996-09-18 Production Casing Operation Performed
1996-09-18 Rig Released
1996-09-25 Well Log Performed
1996-09-26 Perforation Treatment Performed - Jet Perforation
1996-10-30 Well Began Production
1996-10-30 Well Fluid changed to Crude Oil
1996-10-30 Well Mode changed to Pumping
1997-02-10 Perforation Treatment Performed - Cement Squeeze
1997-02-10 Perforation Treatment Performed - Jet Perforation
1997-02-13 Perforation Treatment Performed - Jet Perforation
1998-06-07 Well Fluid changed to Crude Oil
1998-06-07 Well Mode changed to Suspended
2005-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-27 Plug Back Performed
2005-11-27 Well Fluid changed to Crude Oil
2005-11-27 Well Mode changed to Abandoned Zone
2005-11-29 Perforation Treatment Performed - Fractured
2005-11-29 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-09-26 Perforation 835.00 837.00 18
1997-02-10 Perforation 838.50 839.50 13
1997-02-10 Cement Squeeze 838.50 839.50 0
1997-02-13 Perforation 835.00 837.00 18
2005-11-27 Packing Device Capped w/Cement 817.00 825.00 0
2005-11-29 Perforation 679.00 682.00 17
2005-11-29 Fracture 679.00 682.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 1486 0.0 0.0 0.0
1997 4904 0.0 0.0 0.0
1998 3719 0.0 0.0 0.0

For data sources see[5]

References