X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364013307002

Well Details

Well ID: 0364013307002
Loading map...
Location: 00/07-33-036-01W4/2
Location Alias: 00/07-33-36-01 W4M
Location Alias 2: 00/07-33-036-01 W4/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 01
Section: 33
County/Municipality: Municipal District of Provost No. 52
Well Name: Caltex_Res PROVOST 5-33-36-1
Operator Name: Caltex Resources Ltd.
License Number: 0154009
License Date: 1992-10-08
License Status: Suspension
Spud Date: 1992-11-08
Final Drill Date: 1992-11-14
Well Total Depth: 1732.00 m
Surface Hole Latitude: 52.132322
Surface Hole Longitude: -110.102132

For data sources see[1][2]

Well History

Date Event
1992-10-08 Obtained License
1992-11-08 Surface Casing Operation Performed
1992-11-09 Direction Drilling Operation Performed - Horizontal
1992-11-11 Intermediate Casing Operation Performed
1992-11-12 Direction Drilling Operation Performed - Horizontal
1992-11-14 Finished Drilling
1992-11-14 Liner Casing Operation Performed
1992-11-14 Perforation Treatment Performed - Open-Hole Completion
1992-11-14 Perforation Treatment Performed - Slotted Liner or Casing
1992-11-14 Well Mode changed to Drilled and Cased
1992-11-15 Rig Released
1992-11-15 Well Log Performed
1992-11-18 Well Log Performed
1992-12-02 Well Began Production
1992-12-02 Well Fluid changed to Crude Oil
1992-12-02 Well Mode changed to Pumping
1995-10-18 Well Log Performed
1997-11-15 Well Fluid changed to Crude Oil
1997-11-15 Well Mode changed to Suspended
2010-06-26 Well Fluid changed to Crude Oil
2010-06-26 Well Mode changed to Pumping
2011-08-01 Well Fluid changed to Crude Oil
2011-08-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-11-09 465.00 Horizontal
1992-11-12 1016.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-11-14 Slotted Liner 979.00 1619.00 0
1992-11-14 Open Hole/Barefoot Completion 1619.00 1732.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 552 0.0 0.0 0.0
1993 7904 0.0 0.0 0.0
1994 7809 0.0 0.0 0.0
1995 4299 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
2010 528 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-12-09 No Incident Encountered 0.00 0.00

For data sources see[7]

References