X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364013304000

Well Details

Well ID: 0364013304000
Loading map...
Location: 00/04-33-036-01W4/0
Location Alias: 00/04-33-36-01 W4M
Location Alias 2: 00/04-33-036-01 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 01
Section: 33
County/Municipality: Municipal District of Provost No. 52
Well Name: Caltex_Res PROVOST 4-33-36-1
Operator Name: Caltex Resources Ltd.
License Number: 0158972
License Date: 1993-06-09
License Status: Suspension
Spud Date: 1993-06-19
Final Drill Date: 1993-06-21
Well Total Depth: 827.00 m
Surface Hole Latitude: 52.131791
Surface Hole Longitude: -110.095195

For data sources see[1][2]

Well History

Date Event
1993-06-09 Obtained License
1993-06-20 Surface Casing Operation Performed
1993-06-21 Finished Drilling
1993-06-21 Well Mode changed to Drilled and Cased
1993-06-22 Well Log Performed
1993-06-23 Production Casing Operation Performed
1993-06-23 Rig Released
1993-06-30 Perforation Treatment Performed - Jet Perforation
1993-06-30 Well Log Performed
1993-07-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-15 Perforation Treatment Performed - Jet Perforation
1993-07-15 Well Log Performed
1993-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-19 Perforation Treatment Performed - Cement Squeeze
1993-07-29 Well Began Injection
1993-07-29 Well Fluid changed to Water
1993-07-29 Well Type changed to Disposal
2002-11-01 Well Fluid changed to Water
2002-11-01 Well Mode changed to Suspended
2002-11-01 Well Type changed to Disposal
2009-07-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-07-18 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-06-30 Perforation 758.50 762.00 17
1993-07-02 Acid Treatment 758.50 762.00 0
1993-07-15 Perforation 802.50 807.00 13
1993-07-18 Acid Treatment 802.50 807.00 0
1993-07-19 Cement Squeeze 758.50 762.00 0
2009-07-18 Packing Device Capped w/Cement 787.00 795.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0

For data sources see[5]

References