Well Details

Well ID: 0364013203022
Loading map...
Location: 02/03-32-036-01W4/2
Location Alias: 02/03-32-36-01 W4M
Location Alias 2: 02/03-32-036-01 W4/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 01
Section: 32
County/Municipality: Municipal District of Provost No. 52
Well Name: Caltex_Res PROVOST 6-32-36-1
Operator Name: Caltex Resources Ltd.
License Number: 0156368
License Date: 1993-02-08
License Status: Suspension
Spud Date: 1993-02-17
Final Drill Date: 1993-03-07
Well Total Depth: 1989.00 m
Surface Hole Latitude: 52.142473
Surface Hole Longitude: -110.116072

For data sources see[1][2]

Well History

Date Event
1993-02-08 Obtained License
1993-02-18 Surface Casing Operation Performed
1993-02-19 Direction Drilling Operation Performed - Horizontal
1993-02-23 Intermediate Casing Operation Performed
1993-03-01 Direction Drilling Operation Performed - Horizontal
1993-03-05 Well Log Performed
1993-03-06 Well Log Performed
1993-03-07 Finished Drilling
1993-03-07 Liner Casing Operation Performed
1993-03-07 Perforation Treatment Performed - Slotted Liner or Casing
1993-03-07 Well Mode changed to Drilled and Cased
1993-03-08 Rig Released
1993-05-05 Well Log Performed
1993-06-01 Well Began Production
1993-06-01 Well Fluid changed to Crude Oil
1993-06-01 Well Mode changed to Flowing
1993-07-29 Well Log Performed
2001-09-21 Well Fluid changed to Crude Oil
2001-09-21 Well Mode changed to Pumping
2004-02-12 Well Fluid changed to Crude Oil
2004-02-12 Well Mode changed to Suspended
2016-08-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-08-17 Plug Back Performed
2016-08-17 Well Fluid changed to Crude Oil
2016-08-17 Well Mode changed to Abandoned Zone
2017-05-03 Perforation Treatment Performed - Jet Perforation
2018-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-02-16 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-02-19 137.00 Horizontal
1993-03-01 1062.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-03-07 Slotted Liner 881.00 1989.00 0
2016-08-17 Packing Device Capped w/Cement 742.60 750.60 0
2017-05-03 Perforation 177.00 190.00 20
2018-02-16 Packing Device Capped w/Cement 162.00 170.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 5103 0.0 0.0 0.0
1994 8466 0.0 0.0 0.0
1995 7838 0.0 0.0 0.0
1996 7698 0.0 0.0 0.0
1997 8314 0.0 0.0 0.0
1998 8741 0.0 0.0 0.0
1999 8411 0.0 0.0 0.0
2000 8484 0.0 0.0 0.0
2001 8427 0.0 0.0 0.0
2002 7251 0.0 0.0 0.0
2003 7852 0.0 0.0 0.0
2004 839 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-08-18 No Incident Encountered 0.00 0.00
2017-05-14 No Incident Encountered 0.00 0.00
2018-03-06 No Incident Encountered 0.00 0.00

For data sources see[7]