X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364013201F23

Well Details

Well ID: 0364013201F23
Loading map...
Location: F2/01-32-036-01W4/3
Location Alias: F2/01-32-36-01 W4M
Location Alias 2: F2/01-32-036-01 W4/03
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 01
Section: 32
County/Municipality: Municipal District of Provost No. 52
Well Name: CALTEX_RES 1F2 PROVOST 1-32-36-1
Operator Name: Caltex Resources Ltd.
License Number: 0480924
License Date: 2016-10-25
License Status: Suspension
Spud Date: 2016-12-05
Final Drill Date: 2016-12-17
Well Total Depth: 2063.00 m
Surface Hole Latitude: 52.131583
Surface Hole Longitude: -110.102099

For data sources see[1][2]

Well History

Date Event
2016-10-25 Obtained License
2016-12-06 Surface Casing Operation Performed
2016-12-10 Intermediate Casing Operation Performed
2016-12-17 Finished Drilling
2016-12-17 Perforation Treatment Performed - Open-Hole Completion
2016-12-17 Well Mode changed to Drilled and Cased
2016-12-18 Production Casing Operation Performed
2016-12-18 Well Log Performed
2016-12-22 Rig Released
2017-01-20 Liner Casing Operation Performed
2017-01-20 Perforation Treatment Performed - Slotted Liner or Casing
2017-04-01 Well Began Production
2017-04-01 Well Fluid changed to Water
2017-04-01 Well Type changed to Source
2017-04-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-04-26 Plug Back Performed
2017-04-27 Perforation Treatment Performed - Jet Perforation
2017-04-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-04-28 Plug Back Performed
2017-04-29 Perforation Treatment Performed - Jet Perforation
2018-06-26 Well Fluid changed to Water
2018-06-26 Well Mode changed to Suspended
2018-06-26 Well Type changed to Source
2019-05-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-05-24 Perforation Treatment Performed - Cement Plug
2019-05-24 Plug Back Performed
2019-05-24 Well Fluid changed to Water
2019-05-24 Well Mode changed to Abandoned Zone
2019-05-24 Well Type changed to Source

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-12-17 Open Hole/Barefoot Completion 1670.00 2063.00 0
2017-01-20 Slotted Liner 1641.70 2063.00 0
2017-04-26 Packing Device Capped w/Cement 1622.00 1630.00 0
2017-04-27 Perforation 936.00 942.00 20
2017-04-28 Packing Device Capped w/Cement 914.00 922.00 0
2017-04-29 Perforation 763.00 767.00 20
2019-05-24 Cement Plug 884.00 892.00 0
2019-05-24 Packing Device Capped w/Cement 746.00 754.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 456 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-12-17 No Incident Encountered 0.00 0.00
2017-01-20 No Incident Encountered 0.00 0.00
2017-05-01 No Incident Encountered 0.00 0.00
2019-05-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References