0355110310000

Well Details

Well ID: 0355110310000
Loading map...
Location: 00/10-03-035-11W5/0
Location Alias: 00/10-03-35-11 W5M
Location Alias 2: 00/10-03-035-11 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 11
Section: 03
County/Municipality: Clearwater County
Well Name: SHELL ET AL RICINW 10-3-35-11
Operator Name: Shell Canada Limited
License Number: 0073673
License Date: 1978-12-28
License Status: Amended
Spud Date: 1979-01-06
Final Drill Date: 1979-10-06
Well Total Depth: 4686.00 m
Surface Hole Latitude: 51.975476
Surface Hole Longitude: -115.491168

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-12-28 Obtained License
1979-01-06 Direction Drilling Operation Performed - 98
1979-01-20 Lost Circulation Occurred
1979-01-22 Lost Circulation Occurred
1979-04-02 Well Log Performed
1979-06-16 Kick Occurred
1979-07-05 Well Log Performed
1979-07-30 Kick Occurred
1979-08-04 Lost Circulation Occurred
1979-09-10 Kick Occurred
1979-10-06 Finished Drilling
1979-10-09 Production Casing Operation Performed
1979-11-20 Perforation Treatment Performed - Jet Perforation
1979-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-23 Perforation Treatment Performed - Jet Perforation
1979-11-24 Perforation Treatment Performed - Fractured
1979-12-01 Well Mode changed to Drilled and Cased
1987-10-30 Well Log Performed
1989-11-01 Well Began Production
1989-11-01 Well Fluid changed to Gas
1989-11-01 Well Mode changed to Flowing
2000-01-01 Well Fluid changed to Gas
2000-01-01 Well Mode changed to Pumping
2001-06-25 Perforation Treatment Performed - Jet Perforation
2001-06-26 Perforation Treatment Performed - Remedial Casing
2001-06-28 Perforation Treatment Performed - Jet Perforation
2001-06-29 Perforation Treatment Performed - Remedial Casing
2001-07-01 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1979-01-06 3294.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-11-20 Perforation 3325.00 3386.00 4
2001-06-29 Remedial Casing Cementing 1070.00 1070.60 0
1979-11-21 Acid Treatment 3325.00 3386.00 0
1979-11-23 Perforation 3325.00 3328.00 4
1979-11-23 Perforation 3338.50 3344.40 4
1979-11-23 Perforation 3353.00 3361.00 4
1979-11-24 Fracture 3325.00 3361.00 0
2001-06-25 Perforation 1389.60 1390.00 26
2001-06-26 Remedial Casing Cementing 1389.60 1390.00 0
2001-06-28 Perforation 1070.00 1070.60 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 1449 0.0 0.0 0.0
1990 7863 0.0 0.0 0.0
1991 8411 0.0 0.0 0.0
1992 8557 0.0 0.0 0.0
1993 7465 0.0 0.0 0.0
1994 6213 0.0 0.0 0.0
1995 8434 0.0 0.0 0.0
1996 7859 0.0 0.0 0.0
1997 6893 0.0 0.0 0.0
1998 5600 0.0 0.0 0.0
1999 5327 0.0 0.0 0.0
2000 6759 0.0 0.0 0.0
2001 5969 0.0 0.0 0.0
2002 7153 0.0 0.0 0.0
2003 6699 0.0 0.0 0.0
2004 6818 0.0 0.0 0.0
2005 5808 0.0 0.0 0.0
2006 8091 0.0 0.0 0.0
2007 8301 0.0 0.0 0.0
2008 8350 0.0 0.0 0.0
2009 6214 0.0 0.0 0.0
2010 7718 0.0 0.0 0.0
2011 7232 0.0 0.0 0.0
2012 7761 0.0 0.0 0.0
2013 8742 0.0 0.0 0.0
2014 8663 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 4969 0.0 0.0 0.0
2017 8688 0.0 0.0 0.0
2018 8423 0.0 0.0 0.0
2019 3640 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-01-20 Lost Circulation 354.00 354.00
1979-01-22 Lost Circulation 440.00 440.00
1979-06-16 Kick 3747.00 3747.00
1979-07-30 Kick 4644.00 4644.00
1979-08-04 Lost Circulation 4686.00 4686.00
1979-09-10 Kick 4686.00 4686.00

For data sources see[7]