X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355072804000

Well Details

Well ID: 0355072804000
Loading map...
Location: 00/04-28-035-07W5/0
Location Alias: 00/04-28-35-07 W5M
Location Alias 2: 00/04-28-035-07 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 07
Section: 28
County/Municipality: Clearwater County
Well Name: SHININGBANK ET AL CAROLINE 4-28-35-7
Operator Name: TAQA North Ltd.
License Number: 0127360
License Date: 1987-07-15
License Status: Abandoned
Spud Date: 1987-07-28
Final Drill Date: 1987-09-06
Well Total Depth: 2612.00 m
Surface Hole Latitude: 52.030431
Surface Hole Longitude: -114.949772

For data sources see[1][2]

Well History

Date Event
1987-07-15 Obtained License
1987-07-31 Surface Casing Operation Performed
1987-08-08 Lost Circulation Occurred
1987-08-10 Lost Circulation Occurred
1987-08-15 Lost Circulation Occurred
1987-08-18 Well Log Performed
1987-08-20 Lost Circulation Occurred
1987-08-21 Kick Occurred
1987-08-27 Intermediate Casing Operation Performed
1987-09-03 Kick Occurred
1987-09-06 Finished Drilling
1987-09-06 Well Log Performed
1987-09-07 Liner Casing Operation Performed
1987-09-09 Rig Released
1987-09-09 Well Mode changed to Drilled and Cased
1987-09-22 Perforation Treatment Performed - Jet Perforation
1987-09-28 Perforation Treatment Performed - Fractured
1987-10-01 Well Began Production
1987-10-01 Well Fluid changed to Crude Oil
1987-10-01 Well Mode changed to Flowing
1987-10-02 Well Log Performed
1988-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-09-22 Well Fluid changed to Crude Oil
1993-09-22 Well Mode changed to Pumping
1996-11-30 Well Log Performed
1996-12-02 Perforation Treatment Performed - Fractured
1996-12-02 Perforation Treatment Performed - Jet Perforation
1996-12-12 Well Log Performed
1996-12-16 Perforation Treatment Performed - Fractured
2008-03-31 Well Fluid changed to Crude Oil
2008-03-31 Well Mode changed to Suspended
2019-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-07 Perforation Treatment Performed - Bridge Plug No Cement Required
2019-09-07 Perforation Treatment Performed - Jet Perforation
2019-09-07 Plug Back Performed
2019-09-07 Well Fluid changed to Crude Oil
2019-09-07 Well Mode changed to Abandoned Zone
2019-09-08 Perforation Treatment Performed - Bridge Plug No Cement Required
2019-09-12 Perforation Treatment Performed - Bridge Plug No Cement Required
2019-09-12 Perforation Treatment Performed - Jet Perforation
2019-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-13 Plug Back Performed
2019-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-14 Perforation Treatment Performed - Bridge Plug No Cement Required
2019-09-14 Perforation Treatment Performed - Jet Perforation
2019-09-14 Plug Back Performed
2019-12-11 Well Abandoned
2019-12-11 Well Fluid changed to Crude Oil
2019-12-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-09-22 Perforation 2548.00 2553.00 24
2019-09-07 Perforation 1844.00 1846.00 17
2019-09-07 Bridge Plug, No Cement 1847.30 1847.80 0
2019-09-08 Bridge Plug, No Cement 1841.70 1842.30 0
2019-09-12 Bridge Plug, No Cement 1165.00 1165.50 0
2019-09-12 Perforation 1155.00 1157.00 17
2019-09-13 Packing Device Capped w/Cement 1131.00 1144.00 0
2019-09-14 Bridge Plug, No Cement 614.80 615.30 0
2019-09-14 Perforation 604.80 606.80 17
2019-09-14 Packing Device Capped w/Cement 583.00 595.00 0
1987-09-28 Fracture 2548.00 2553.00 0
1988-09-30 Acid Treatment 2548.00 2553.00 0
1991-10-10 Acid Treatment 2548.00 2553.00 0
1993-09-20 Acid Treatment 2548.00 2553.00 0
1996-12-02 Perforation 2549.00 2552.00 20
1996-12-02 Fracture 2549.00 2552.00 0
1996-12-16 Fracture 2549.00 2552.00 0
2019-09-07 Packing Device Capped w/Cement 2399.80 2408.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 1874 0.0 0.0 0.0
1988 3099 0.0 0.0 0.0
1989 1618 0.0 0.0 0.0
1990 1080 0.0 0.0 0.0
1991 716 0.0 0.0 0.0
1992 7020 0.0 0.0 0.0
1993 4217 0.0 0.0 0.0
1994 8555 0.0 0.0 0.0
1995 8731 0.0 0.0 0.0
1996 6215 0.0 0.0 0.0
1997 7382 0.0 0.0 0.0
1999 7617 0.0 0.0 0.0
2000 8775 0.0 0.0 0.0
2001 8311 0.0 0.0 0.0
2002 8235 0.0 0.0 0.0
2003 8555 0.0 0.0 0.0
2004 8256 0.0 0.0 0.0
2005 6564 0.0 0.0 0.0
2006 8490 0.0 0.0 0.0
2007 2135 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1987-08-08 Lost Circulation 1794.00 1818.00
1987-08-21 Kick 2189.00 2189.00
1987-08-10 Lost Circulation 1975.00 1975.00
1987-08-15 Lost Circulation 2448.00 2502.00
1987-08-20 Lost Circulation 2189.00 2533.00
1987-09-03 Kick 2557.80 2557.80
2019-08-27 No Incident Encountered 0.00 0.00

For data sources see[6]

References